Laserfiche WebLink
Water Information Section Work Plan <br />Key Element /Action <br />Person(s) <br />Estimated Time for Completion <br />Res onsible <br />Develop and secure funding for an ISF Needs Assessment, including digitizing <br />Anne, Greg <br />Phase 1 (digitizing) is 2/3 done; if <br />ISF and lake water rights for GIS <br />new funding request is granted <br />should complete by August 2002. <br />Phase 2 (GIS layers) will follow <br />Develop methodology to track/administer ISF water rights within DWR's <br />accounting system <br />Prepare a report for publication that explains how the ISFs held by the board <br />Mark, Greg <br />protect the environment <br />In coordination with the Water Supply Protection Program, begin the process of <br />Anne, Jeff, Greg, Dan <br />Ongoing <br />preparing a map or other tool, based on a water division or watershed, that <br />demonstrates that the board's instream flows are consistent with allowing water <br />to cross the state's boundaries under interstate compacts. The map should also <br />demonstrate that such flows need not impede the development of water delivered <br />intrastate (when completed, such a map could be prepared for each basin or <br />division and then updated annually). (Portions of this task are connected to the <br />ISF DSS) <br />Draft and publish ISF newsletter quarterly <br />Bahman <br />Develop and maintain web access to ISF database and update the ISF/NLL water <br />Anne <br />rights tabulations annually <br />Develop and maintain imaging library for Stream and Lake Protection files <br />Anne, Jeff <br />including stream and lake decrees, opposed cases, and acquisitions. Develop and <br />implement a plan for Web access to imaged documents <br />Supporting imaging committee within CWCB <br />Page 4 of 5 5/29/2003 <br />