My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150272 Contract
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150272 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2014 11:59:39 AM
Creation date
7/10/2012 8:54:35 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150272
Contractor Name
Farmers Pawnee Canal Company, The
Contract Type
Loan
Water District
0
County
Logan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
general aggregate, including products /completed operations and personal injury. <br />b. Prior to the disbursement of any loan funds, the BORROWER shall provide the <br />CWCB with an Acord Form 25 evidencing said insurance and shall provide the <br />CWCB with documentation of renewals of said insurance. <br />17. Additional Contract Requirements. Any additional contract requirements are set <br />forth in Additional Contract Requirement (Section 7) of the Project Summary. <br />B. PROJECT PROVISIONS <br />1. Construction Fund Program Procedures. During the completion of the PROJECT, <br />the BORROWER shall adhere to the CWCB Construction Fund Program Procedures <br />(Section 8), of the Project Summary. <br />2. Eligible Expenses. The PROJECT expenses for which the BORROWER is eligible for <br />loan disbursements are listed in Eligible Expenses (Section 9) of the Project <br />Summary. <br />3. Loan Disbursements. The CWCB shall disburse loan funds in accordance with the <br />Disbursement Schedule (Section 10) of the Project Summary. <br />4. Time for Performance. The BORROWER recognizes that time is of the essence in <br />the performance of all of its obligations under this contract. Therefore, the <br />BORROWER shall complete the PROJECT within the time specified in Time for <br />Performance (Section 11) of the Project Summary. <br />5. Indemnification By The Construction Firm. The BORROWER shall require all <br />Construction Firms and their subcontractors to indemnify the STATE and the <br />BORROWER against all liability and loss, and against all claims and actions based <br />upon or arising out of damage or injury, including death, to persons or property, <br />caused by any acts or omissions of those parties or sustained in connection with the <br />performance of any contract related to the PROJECT or by conditions created thereby, <br />or based upon any violation of any statute, ordinance, or regulation, and the defense <br />of any such claims or actions. <br />6. Liability Insurance During Construction. During construction of the PROJECT, the <br />BORROWER shall require the construction firm(s) and any subcontractors to maintain <br />the following insurance coverage in the limits shown during the term of their contracts <br />for the construction of the PROJECT. The BORROWER shall provide the CWCB with an <br />Acord Form 27 evidencing said insurance prior to commencement of construction, <br />maintained until construction is complete, and shall provide the CWCB with <br />documentation of renewals of said insurance. No payments shall be made to the <br />BORROWER unless all insurance certificates are current. <br />a. Builder's risk insurance for construction in progress for all perils of loss including <br />fire, wind, hail, and vandalism in an amount equal to the completed value of the <br />PROJECT. <br />Loan Contract C150272 <br />Page 6 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.