Laserfiche WebLink
The collateral provided for this loan, as evidenced by the executed Security <br />Agreement, in the form attached as Appendix 4 and incorporated herein, shall be <br />pledge of Borrower's revenue assessments backed by a rate covenant ( "Collateral "). <br />SECTION 7 — ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br />No additional conditions or contract requirements <br />SECTION 8 — CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PROJECT. <br />B. The BORROWER'S and the Engineering Consultant's Agreements and the plans <br />and specifications must be submitted to the CWCB staff for verification of <br />compliance with the terms of this Contract when available prior to bidding. Any <br />modifications to the plans and specifications must be approved in writing by the <br />CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined <br />by § 37 -87 -105 C.R.S., the BORROWER shall provide a letter of approval from the <br />State Engineer's Office prior to construction. <br />D. CWCB staff must be present at bid opening and must approve the award of the <br />construction contract. <br />E. The BORROWER shall contract for the construction of the work with responsible <br />and capable Construction Firms, which said Construction Firms shall be selected <br />by the BORROWER and found acceptable by the CWCB staff. <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br />the terms of this contract, the BORROWER may issue the notice to proceed to the <br />Construction Firms. <br />G. The BORROWER shall conduct a pre - construction conference at which time the <br />CWCB staff shall have the opportunity to review and approve the construction <br />schedule. <br />K If the CWCB staff determines that the PROJECT requires a resident inspector <br />during construction, the BORROWER shall employ an inspector who has been <br />approved by the CWCB staff. <br />I. The BORROWER shall construct the PROJECT in accordance with the approved <br />plans and specifications. <br />J. Upon completion of the PROJECT construction, the BORROWER shall provide as- <br />built drawings of the PROJECT to the CWCB staff, or, if required by § 37 -87 -105, <br />Appendix 1 to Loan Contract C150272 <br />Page 2 of 3 <br />