My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150272A Contract
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150272A Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2013 7:39:29 AM
Creation date
7/10/2012 8:54:32 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150272A
Contractor Name
Farmers Pawnee Canal Company, The
Contract Type
Loan
Water District
0
County
Logan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BORROWER: FARMERS PAWNEE CANAL Agency Name: Water Conservation Board <br />COMPANY Agency Number PDA <br />Contract No. C150272 A C „v� f # 3 Z (O -7 <br />Original Loan Amount $227,250 <br />Adjustment (Increase): $28,280 <br />Adjusted Loan Amount $255,530 <br />LOAN CONTRACT AMENDMENT NO. 1 <br />(STANDARD CONTRACT -WAIVER #160- APPROVED NOVEMBER 10, 2003) <br />This Amendment, made this April 1, 2011, by and between the State of Colorado <br />for the use and benefit of the Department of Natural Resources, Colorado Water <br />Conservation Board ( "CWCB "), and the Farmers Pawnee Canal Company, a Colorado <br />nonprofit corporation ( "BORROWER" or "CONTRACTOR "). <br />FACTUAL RECITALS <br />A. Authority exists in the law, and funds have been budgeted, appropriated, and <br />otherwise made available for payment in Contract Encumbrance Number C150272. <br />B. Required approval, clearance, and coordination have been accomplished from and <br />with appropriate agencies. <br />C. The CWCB and the BORROWER entered into Contract Encumbrance Number <br />C150272, dated December 15, 2008 ( "ORIGINAL CONTRACT"), incorporated herein by <br />reference, wherein the CWCB agreed to loan money in the total amount up to <br />$227,250, and the BORROWER agreed to repay the loan in accordance with the terms <br />of the ORIGINAL CONTRACT. <br />D. During construction of the Project, the BORROWER encountered unforeseen site <br />conditions, design modifications, and a need for additional work due to changes not <br />anticipated in the original project cost estimate. These items increased the cost of <br />the PROJECT to $281,000. To meet the increased costs, the BORROWER requested <br />an additional $28,280 for a total loan amount of $255,530. <br />E. At its March 2011 meeting, the CWCB approved increasing this loan by $28,280 for a <br />total loan amount of up to $255,530 to finance up to 90% of the total Project costs. <br />The terms for the additional loan amount are an interest rate of 2.50% per annum and <br />a repayment period of 30 years. A loan service fee of 1% has been imposed on the <br />additional loan amount In accordance with CWCB Policy No. 16. <br />F. Furthermore, the BORROWER has requested an extension in the time the CWCB has <br />allowed for completion of the Project. <br />G. The CWCB and the BORROWER have agreed to amend this contract to increase the <br />amount of the loan by $28,830 including the 1% loan service fee for a total loan <br />amount of up to $255,530 which may be used to finance up to 90% of the total Project <br />cost, and to extend the time for completion of the project for an additional two (2) <br />years. <br />NOW THEREFORE, it is hereby agreed that <br />1. Consideration for this Amendment to the ORIGINAL CONTRACT consists of the payments <br />that shall be made pursuant to this Amendment and the ORIGINAL CONTRACT, and the <br />Page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.