Laserfiche WebLink
(iii) PRRIP is terminated and no replacement program addressing water <br />related impacts to the species that are the focus of PRRIP is put in place <br />within a reasonable rime; <br />(iv) SPWRAP is dissolved. <br />c.) Terminarion shall be effective 30 days after a notice, provided in <br />accordance with paragraph 15 below, stating the gounds for such termination. <br />SPWRAP shall have no liahility for elechical or other O&M costs inciured a$er <br />the effective date of the termination, end shall be enritled to claim only those <br />credits resulting from pumping that occurred prior to teimination for which Lower <br />was reimbursed. Terminarion as provided herein may be in addidon to, and shall <br />not be in exclusion of other remedies available at law or in equity. . <br />(8) Lower's Genera( Liability Insnrance policy will name CWCB/CDNR and <br />SPWRAP as additional insured with regard to liability arising from the conshuction, <br />operarion and maintenance of HRWP. During the period of HWRP construction only, <br />DU's General Liability Insurance policy will name CWCB/CDNR, SPWRAP and Lower <br />as addihonal insureds with regard to liability arising from the conshvction of HRWP. <br />(9) Risk of Loss. The HRWP facilities buitt within the South Platte River flood plain <br />cannot be insured against casuaity loss due to flooding. 1n the event HRWP facilities aze <br />damaged or destroyed by flood, after consultation with the Parties, SPWR.AP will rebuiId <br />the damaged HWRP facilities, provided the recharge credits are still cost-justified. If the <br />Parties determine the recharge credits are not cost-justified, the Agreement will be <br />terminated pursuant Paragraph 7. Lower will obtain insurance coverage for casualty loss <br />of HRWP facilities due to events such as lighting shikes, theft and vandalism and will <br />document the amount by wlvch such coverage increases the insurance costs it would <br />otherwise bear. SPWRAP will reimburse Lower for this incrementa] incmase in its <br />insurance cost. <br />(10} Wairanties. DU warrants that the construcCion work will be of good quality, free <br />from improper worl�anship and defective materials, and that the HWRP will be <br />constructed in accordance with the Approved Design. DU agrees to comxt al] <br />construction work which proves to be defective in material and/or workmanship within a <br />period of one year following the completion of construction. All warranties of longer <br />than one year duration for equipment and materials incorporated into the HWRP will be <br />assigned by DU to Lower, <br />(11) Assignment. No party hereto shalt assign its rights or delegate its obligarions <br />pursuant to that portion of the Agreement pertaining to the construction and operation of <br />the HRWP without the written consent thereto of all other parties hereto. Neither Lower <br />nor SPWRAP shall assign its rights or obligations pursuant to that portion of the <br />Agreement pertaining to the lease of river accretion credits without the written consent <br />( HRWPProjectSpecificAgrl.2]-09 <br />