Laserfiche WebLink
maintenance costs associated with the HRWP, 3) electrical costs to pump the <br />HRWP, 4) other costs associated with the HRWP. <br />13.The parties agree that the HRWP will primarily be operated each year during the <br />non-South Platte Compact period, (October 16t" thru March 3161) and thal <br />diversions to the HRWP will occur during most of this time period. HRWP may <br />also be operated during the South Platte Compact period when the January $, <br />2008 water right to be decreed in Case No. 08CW24 is in priority, and may be <br />operated out-of-prioriry during the South Platte Compact period subject to the <br />terms of paragraph 9. Lower and SPRR acknowledge that operations will be <br />subject to constraints such as water availability in the river, icing, other inclement <br />weather conditions, and pond capacity and recharge rates. During HRWP <br />operations, water shall be delivered in equal priority to Pond 1 and Pond 4 as <br />shown on the attached Exhibit C(for SPRR habitat needs and Lower's <br />development of longer term recharge accretion credits) prior to delivery of water <br />to Ponds 2 and 3 as shown on the attached Exhibit C. If Lower dces not operate <br />the HRWP for at least 50% of the non-South Platte Compact period for three <br />consecutive years, Phase 1 of this Agreement shall terminate and Phase 2 shall <br />begin, as further described in paragraphs 18 and 19 of this Agreement. For the <br />purpose of determining whether or not Lower has operated the HRWP 50% of <br />the time, periods when diversions were not made due to water availability, icing, <br />other inclement weather conditions, or pond capacity and recharge rates, shall be <br />excluded. <br />, 14. Lower's financial obligations under this Agreement including, but not limited to, <br />construction and operation costs, are contingent upon obtaining funds from <br />SPWRAP and other government sources in amounts sufficient to cover Lower's <br />, <br />� <br />obligations. This contingency shall be deemed satisfied at the sole determination <br />of Lower. <br />15. Lower agrees to pay electrical costs for out-of-priority pumping defined in <br />paragraph 9 so long as all requirements described in paragraph 9 are met. <br />� 16.A11 unused and non leased credits from the HRWP <br />and Lower's allocation, not needed to augment <br />� Sedgwick County shall be dedicated to SPWRAP <br />for its use at no cost when needed by the PRRIP. <br />from both SPRR's allocation <br />out-of-priority depletions in <br />and/or the State of Colorado <br />�' 17.The parties agree that the use of accretion credits generated by HRWP shall be <br />limited to replacement of depletions originating or occurring in Sedgwick County, <br />Colorado and/or to the State of Colorado's water obligation to the PRRIP. <br />I' <br />' <br />' <br />18.The term of this Agreement shall be divided into two phases, "Phase 1" and <br />"Phase 2". The term of Phase 1 shall be for 30 years beginning the date both <br />4 <br />