My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150332 Approval Letter 3/23/12
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150332 Approval Letter 3/23/12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 1:47:27 PM
Creation date
6/26/2012 2:48:28 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-033
C150332
Contractor Name
Terrace Irrigation Company
Contract Type
Loan
Water District
3
County
Conejos
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Sheet, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />Fax: (303) 866-4474 <br />www.cwcb.state.co.us <br />TO: Colorado Water Conservation Board Members <br />FROM: Ryan Edwards, P.E., Project Manager Wl _ <br />Kirk Russell, P.E., Chief <br />l�e� <br />Finance Section q- <br />DATE: March 9, 2012 (Updated March 23, 2012) <br />John W. Hickenlooper <br />Governor <br />Mike King <br />DNR Executive Director <br />Jennifer L. Gimbel <br />CWCB Director <br />SUBJECT: Agenda Item 16a, March 20 -21, 2012 Board Meeting <br />Finance Section/Water Supply Planning <br />Terrace Irrigation Company — Spillway Replacement Project <br />Water Project Loan — Construction Fund <br />Introduction <br />The Terrace Irrigation Company (Company) is applying for a loan for the Spillway Replacement <br />Project (Project). The purpose of the Project is to remove a seven -foot gauge height restriction <br />imposed by the State Engineer's Office (SEO). The total Project cost is estimated to be $4,500,000. <br />The Company has requested a loan for $1,000,000, a Water Supply Reserve Account (WSRA) grant <br />for $1,500,000, and a Summitville Natural Resource Damage (NRD) grant for $2,000,000 to fund <br />the construction of the Project. In conjunction with the new loan request, the Company is also <br />seeking a consolidation of the balance on its three existing CWCB loans in consideration for <br />2,000AF of instream flow storage rights in Terrace Reservoir. The existing loans have a combined <br />principal balance of $1,724,721. See attached Project Data Sheet for a location map and project <br />summary. <br />Staff Recommendation (Board approved recommendation on March 20, 2012) <br />Staff recommends the Board approve a loan, from the Construction Fund, not to exceed $2,751,968 <br />($2,724,721 for project costs and $27,247 for the 1% Loan Service Fee) to the Terrace Irrigation <br />Company for the Spillway Replacement Project. The loan terms shall be 30 years at the agricultural <br />restricted reservoir interest rate of 1.75% per annum. Security for the loan shall be in compliance <br />with CWCB Financial Policy #5. <br />Staff further recommends the contract include a condition stating: Should the Project fail to reach <br />substantial completion before expiration of the contract the Project will initiate repayment at an <br />interest rate of 4.15 % in lieu of 1.75 %. <br />Interstate & Federal • Watershed & Flood Protection • Stream & Lake Protection • Finance <br />Water Information • Water Conservation & Drought Planning • Water Supply Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.