My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C154202 Contract
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C154202 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 3:55:08 PM
Creation date
6/19/2012 3:49:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C154202
Contractor Name
Animas-La Plata Project
Contract Type
Grant
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Project Operations Committee consisted of representatives from those entities that <br />identified by the Settlement Act, as amended, to receive a water allocation and the Bureau <br />of Reclamation. This committee determined an appropriate entity to contract with Reclamation <br />4 forte operation, maintenance, and replacement (OM &R) of the Project Works and developed a <br />5 corn non understanding among the project beneficiaries of the appropriate level of annual <br />6 OM R activities to be performed on the Project Works to assure the Projects long term <br />7 oper itional integrity and public safety. This committee was essentially replaced by the <br />8 Ass ciation who subsequently entered into an OM &R contract with Reclamation. Ultimately, <br />9 the ssociation will oversee the ongoing OM &R activities of the Project Works, providing <br />10 con ultation and coordination among Association members on such items as annual OM &R <br />11 fun ing, maintenance schedules, and public safety issues. <br />12 <br />13 <br />14 <br />15 <br />4. MEASUREMENT AND RESPONSIBILITY FOR DISTRIBUTION OF STATUTORY <br />WATER ALLOCATION <br />The water released or bypassed for the State pursuant to this contract shall be measured <br />16 at t ie outlet works of Ridges Basin Dam, and/or in the Animas River at the Durango Pumping <br />17 Plait with measuring facilities installed by the United States as a part of the Project. Additional <br />18 poi is of diversion directly from Lake Nighthorse may be made in the future by the State after <br />19 co sultation and approval of the United States. Water delivered at these additional points of <br />20 di ersion on Lake Nighthorse shall be measured at those points of diversion by facilities <br />21 pr vided by the State or its subcontractors. Water will be available at the outlet works of Ridges <br />22 Ba sin Dam and /or the Animas River in such quantities as the State determines, subject to <br />23 <br />limitations of the relevant facilities, to ensure that the State annually receives a <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.