My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150233 Approval Letter 5/18/12
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150233 Approval Letter 5/18/12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2012 2:51:30 PM
Creation date
5/24/2012 2:48:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150233
Contractor Name
Tom Hill
Contract Type
Loan
County
Grand
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3441 <br />Fax: (303) 866-4474 <br />www. cwcb. state. co.us <br />TO: Colorado Water Conservation Board Members <br />FROM: Kirk Russell, P.E., Chief <br />Finance Section <br />DATE: May 4, 2012 (UPDATED May 18, 2012) <br />SUBJECT: Agenda Item 26a, May 15-16,2012 Board Meeting <br />Finance Section — Changes to Existing Loans <br />Tom Hill — McElroy Dam Rehabilitation Project <br />Introduction <br />John W. Hickenlooper <br />Governor <br />Mike King <br />DNR Executive Director <br />Jennifer L. Gimbel <br />CWCB Director <br />In November 2006 the CWCB approved a 30 -year loan to Tom Hill, a rancher in Grand County, for <br />$862,540 from the Severance Tax Trust Fund Perpetual Base Account. The loan was used to breach <br />and rehabilitate the McElroy Reservoir Dam which provides irrigation water to the Hill's Gore Pass <br />Ranch. The loan was secured by land and water rights associated with the Gore Pass Ranch. The <br />original Board approval has needed several modifications. A description of important events over <br />the past five years is provided in the memo along with a table of an Approximate Timeline. <br />In April the Hills made a partial payment of $40,000 towards the loan. Staff will ask the Board to <br />consider .a restructuring of the loan to improve the Hills ability to repay the loan until the Gore Pass <br />Ranch is sold. I <br />Staff Recommendation (Board Approved as Recommended on May 16, 2012) <br />Staff recommends the Board approve a loan amendment to restructure Loan Contract No. C 150233 <br />from its current 10 year term to a term of 27 years at the agricultural rate of 2.50% per annum for <br />the remaining principal balance of $715,942.01. Security for the loan shall not change and is in <br />compliance with CWCB. Financial Policy #5. <br />Background <br />The McElroy Reservoir (Reservoir) has been owned and operated by Tom and Linda Hill for the <br />last 30 years. The Reservoir is located on State Land Board property and is authorized by a 10 -year <br />renewable lease terminating June 2016. The Hills use the water stored in the Reservoir to irrigate <br />hay on the 2,588 acre Gore Pass Ranch. The Ranch is located upstream of Wolford Mountain <br />Reservoir and diverts water from McElroy Creek. <br />Interstate & Federal • Watershed & Flood Protection • Stream & Lake Protection • Finance <br />Water Information • Water Conservation & Drought Planning • Water Supply Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.