Laserfiche WebLink
• 0 <br />THE PARTIES HERETO HAVE EXECUTED THIS CONTRACT <br />BORROWER: Boulder and White Rock <br />Ditch and Reservoir Company <br />By <br />J1 <br />(S EAL) <br />Attest <br />By <br />Dan Grant, Secretary - Treasur r <br />�-' <br />State of Colorado <br />John W. Hickenlooper <br />C- VK5'0' q.:Z ;;?,S/ <br />By ✓�r� <br />For the Execut a Director <br />Department of Natural Resources <br />Colorado Water Conservation Board <br />Jennifer L. Gimbel, Director <br />Pre-Approved <br />7,pt Manager <br />CWCBt. Manager <br />ALL CONTRACTS MUST BE APPROVED BY THE STATE CONTROLLER <br />CRS 24 -30 -202 requires that the State Controller approve all state contracts. This <br />contract is not valid until the State Controller, or such assistant as he may <br />delegate, has signed it. The contractor is not authorized to begin performance until <br />the contract is signed and dated below. If performance begins prior to the date <br />below, the State of Colorado may not be obligated to pay for the goods and /or <br />services provided. <br />David J. McDermott, CPA, State Controller <br />By <br />Effective Date <br />Loan Contract C150279 Amendment No. 2 <br />Page 5 of 5 <br />