My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150279 Contract
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150279 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 12:27:08 PM
Creation date
5/24/2012 9:03:12 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150279
Contractor Name
Boulder White Rock Ditch and Reservoir Company
Contract Type
Loan
County
Boulder
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 • <br />PROMISSORY (VOTE <br />Date: December 15, 2009 <br />Borrower: Boulder and White Rock Ditch and Reservoir <br />Company <br />Principal Amount: $2,864,164 <br />Interest Rate: 3.45% per annum <br />Term of Repayment: 30 years <br />Loan Contract No.: C150279, dated February 13, 2009 <br />Loan Payment: $154,754.39 <br />Payment Initiation Date *: <br />Maturity Date *: <br />* Payment Initiation Date and Maturity Date fields are filled in after the project has <br />been substantially completed. <br />1. FOR VALUE RECEIVED, the BORROWER promises to pay the Colorado Water <br />Conservation Board ( "CWCB "), the Principal Amount plus Interest for the Term <br />of Repayment, pursuant to the LOAN CONTRACT and this promissory note. <br />2. This Promissory Note replaces and supersedes the Promissory Note dated <br />February 13, 2009, in the principal amount of $2,430,060. <br />3. Principal and interest shall be payable in equal Loan Payments, with the first <br />payment due and payable one year from Payment Initiation Date and annually <br />thereafter. All principal, interest, and late charges, if any, then remaining <br />unpaid shall be due and payable on or before the Maturity,Date. <br />4. Payments shall be made to the Colorado Water Conservation Board at 1313 <br />Sherman Street, Room 721, Denver, Colorado 80203. <br />5. The CWCB may impose a late charge in the amount of 5% of the annual <br />payment if the CWCB does not receive the annual payment within 15 calendar <br />days of the due date. <br />6. This Note may be prepaid in whole or in part at any time without premium or <br />penalty. Any partial prepayment shall not postpone the due date of any <br />subsequent payments or change the amount of such payments. <br />7. All payments received shall be applied first to late charges, if any, next to <br />accrued interest and then to reduce the principal amount. <br />8. This Note is issued pursuant to the LOAN CONTRACT between the CWCB and <br />the BORROWER. The LOAN CONTRACT creates security interests in favor of the <br />Appendix B to Loan Contract C150279 <br />
The URL can be used to link to this page
Your browser does not support the video tag.