Laserfiche WebLink
THE PARTIES HERETO HAVE EXECUTED THIS CONTRACT <br />BORROWER: North Delta Irrigation <br />Company, a Colorado nonprofit <br />corporation <br />Ken Nelson, President <br />(SEAL) <br />State of Colorado <br />John W. Hickenlpoper, Governor <br />By �--- <br />For the Exec ive Director <br />Department 6f Natural Resources <br />Colorado Water Conservation Board <br />Jennifer L. Gimbel, Director <br />Attest <br />By <br />By <br />Car 4n K. H kins,Secretary/Treasurer <br />Pre;Approved Form <br />B (Cont%ct Manager <br />ALL CONTRACTS MUST BE APPROVED BY THE STATE CONTROLLER <br />CRS 24 -30 -202 requires that the State Controller approve all state contracts. This <br />contract is not valid until the State Controller, or such assistant as he may <br />delegate, has signed it. The contractor is not authorized to begin performance <br />until the contract is signed and dated below. If performance begins prior to the <br />date below, the State of Colorado may not be obligated to pay for the goods and /or <br />services provided. <br />David J. McDermott, CPA, State Controller <br />By <br />Effective Date <br />Loan Contract C150331 <br />Page 11 of 11 <br />