My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150318 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150318 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2013 1:10:06 PM
Creation date
5/10/2012 7:53:34 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150318
Contractor Name
Last Chance Ditch Company
Contract Type
Loan
Water District
5
County
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
dr wings of the PROJECT to the CWCB staff, or, if required by § 37 -87 -105, C.R.S., <br />th BORROWER shall provide the as -built drawings to the State Engineer's Office for <br />ap roval and filing. <br />K. Uppn completion of the PROJECT construction, the BORROWER shall arrange a final <br />ins ection for the CWCB staff. <br />L. Tht BORROWER shall pay all of the expenses related to the PROJECT when such bills <br />arl due. <br />SECTION q— ELIGIBLE EXPENSES. The following items are eligible for loan disbursements. <br />A. Preparing final designs and specifications for the PROJECT. <br />B. Pr paring bid and construction contract documents. <br />C. Pr paring environmental assessment or environmental impact statements, and <br />of erwise complying with the Federal National Environmental Policy Act. <br />D. C plying with all federal, state, and local regulatory requirements, including the <br />ob aining of all required permits. <br />E. Fi and wildlife mitigation measures required by federal, state, or local laws and <br />re ulations. <br />F. Ac ual construction as called for in the design documents and in change orders <br />ap roved by the CWCB and the BORROWER. <br />G. En 3ineering services for construction management, including design and <br />coi istruction management for CWCB- approved change orders. <br />H. Int rest during completion of the PROJECT pursuant to Paragraph AA of the <br />1. Le al services for reviewing engineering services contracts, reviewing this Contract, <br />re ewing construction contract documents, and for complying with all federal, state, <br />an local regulatory requirements. <br />J. PR JECT- related expenses incurred prior to the Effective Date of this contract in <br />ac ordance with the approval of this loan. <br />10 — DISBI IRSEMENT SCHEDULE <br />Foi Project costs: The BORROWER shall prepare a periodic progress report which <br />cor tains a statement of the PROJECT costs expended for that period and shall <br />fonvard said statement to the CWCB. After receipt of the periodic progress report <br />froi n the BORROWER, and review and acceptance of the items therein as eligible <br />exr erases as described below, the CWCB will pay to the BORROWER the amount set <br />fori 1 in the report or such portion that has been approved by the CWCB. Such <br />pa ment shall be made within thirty (30) days from the CWCB's approval of each <br />prc gress report. <br />SECTION 1 I — TIME FOR PERFORMANCE <br />PR JECT Beginning: Upon Effective Date of this Contract (the date this contract is <br />sig ied by the State Controller or his designee). <br />PR JECT Finish: Four (4) years from the Effective Date of this Contract. <br />Appendix 1 to Loan Contract C160318 <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.