My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150318 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150318 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2013 1:10:06 PM
Creation date
5/10/2012 7:53:34 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150318
Contractor Name
Last Chance Ditch Company
Contract Type
Loan
Water District
5
County
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
condE mnation award to be applied to the prompt replacement, repair and restoration of <br />the P ROJECT facilities or any portion thereof, or to repayment of this loan. Any net <br />proce ds remaining after such work has been completed or this loan has been repaid, <br />shall a retained by the BORROWER. If the net insurance proceeds are insufficient to <br />pay t e full cost of the replacement, repair and restoration, the BORROWER shall <br />comp! to the work and pay any cost in excess of the net proceeds. In the event <br />BORR WER chooses to repay the loan, BORROWER shall remain responsible for the full <br />loan mount outstanding regardless of the amount of such insurance proceeds or <br />cond nation award. <br />9. Capti ns. The captions and headings contained in this contract are for convenience <br />and r ference only and shall not be construed so as to define or limit the terms or <br />provis ns contracted herein. <br />10. CWC `s Approval. This contract requires review and approval of plans, specifications, <br />and v 3rious other technical and legal documents. The CWCB's review of these <br />docu ents is only for the purpose of verifying BORROWER'S compliance with this <br />contra t and shall not be construed or interpreted as a technical review or approval of <br />the actual design or construction of the PROJECT. Notwithstanding any consents or <br />approvals given to the BORROWER by the CWCB on any such documents, BORROWER <br />and E ny of its consultants, by preparing any such documents, shall be solely <br />respor isible for the accuracy and completeness of any of said documents. <br />11. Waive . The waiver of any breach of a term of this contract shall not be construed as a <br />waiver of any other term, or of any subsequent breach of the same term. <br />12.Addresses for mailing. All notices, correspondence, or other documents required by <br />this contract shall be delivered or mailed to the addresses shown in the Section 1 <br />(BORROWER Information) of the Project Summary, for the BORROWER and to the <br />addre s below for the CWCB: <br />Co orado Water Conservation Board <br />Aft Construction Fund Section <br />13 3 Sherman Street, Room 721 <br />De iver, CO 80203 <br />Loan Contract C150318 <br />Page 8 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.