My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150130 Project Summary
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150130 Project Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2012 11:53:14 AM
Creation date
4/27/2012 12:30:49 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150130
Contractor Name
South Side Reservoir Company
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SOUTH SIDE RESERVOIR COMPANY <br />RESERVOIR REHABILITATION <br />Completed Spillway Improvements at South Side Reservoir <br />Proiect Description <br />The South Side Reservoir Company operates the South Side Reservoir, which provides irrigation water <br />within a 1,590 -acre service area. The South Side Reservoir is located approximately 1 mile southwest of the <br />City of Loveland. This $300,000 project involved the rehabilitation of the outlet structure and spillway. The <br />completed improvements removed the State Engineer's storage restriction, which prohibited the Company to <br />fill the 39 -foot dam beyond gauge height 22.5 feet. The removal of the restriction allows the Company to fill <br />the dam to capacity (620 acre - feet), regaining the 172 AF lost to the restriction. The spillway work was <br />completed in 2007 and the outlet works was recently completed in the spring of 2009. <br />Proiect Data <br />Sponsor: South Side Reservoir Co. County: Larimer Water Source: Big Thompson River <br />Terms of Loan: $360,000 @ 3.1% for 30 -yrs. Substantial Completion Date: July 1, 2009 <br />Design Engineer: Smith Geotechnical, Inc. — Fort Collins, Colorado <br />Construction Contractor: Zak Dirt, Inc. — Longmont, Colorado (Spillway) <br />InsituForm, Inc. — Fort Collins, Colorado (Outlet Works) <br />Construction Elements: breech dam to remove and replace the 16" steel outlet pipe, relocate <br />control gates and rehabilitate spillway. <br />Average Annual Diversion: 1,241 acre -feet <br />
The URL can be used to link to this page
Your browser does not support the video tag.