|
39:3727 04-13-2012 01:486 PM Fagg 4 of 4
<br />EXHIBIT A TO APPENDIX 5- WATER RIGHTS
<br />The following water rights situate, lying and being in the County, of Huerfano and COLORADO,
<br />described as follows:
<br />ORLANDO RESERVOIR NO.2, decreed for a total of 3,110 acre feet storage, as follows:
<br />I) ORLANDO RESERVOIR NO. 2, for storage of 43,560,000 cubic feet of water (1,000
<br />acre - feet), for irrigation, date of appropriation December 14, 1905, date of adjudication October 3,
<br />1921 (previous adjudication date was October 15, 1901), in Civil Action No. 1414, District Court, in
<br />and for Huerfano County, located in Section 17, Township 26 South, Range 66 West, 6th PM,
<br />Huerfano County, Colorado, sources The Huerfano River through and by means of the Orlando
<br />Canal No.3, and Greasewood Arroyo, through and by means of the Greasewood Arroyo
<br />Diverting Canal, and as more particularly describes in the aforesaid Decree entered October 31,
<br />1921, in Civil Action No. 1414 (Priority No. 349).
<br />II) ORLANDO RESERVOIR NO. 2, (ENLARGEMENT), for storage of 35,078,750 CUBIC
<br />FEET OF WATER (800 acre - feet), for irrigation, date of appropriation December 14, 1905, date of
<br />adjudication (conditional) October 3, 1921 in Civil Action No. 1414, District Court, in and for
<br />Huerfano County, located in Section 17, Township 26 South, Range 66 West, 6th PM, Huerfano
<br />County, Colorado, sources The Huerfano River and Greasewood Arroyo, and the conditional right
<br />made absolute by Decree in Civil Action No. 1414 -60, and 1414 -62, entered November 1, 1960, and
<br />November 8, 1962 (Priority No.349).
<br />I1I) ORLANDO RESERVOIR NO. 2, (SECOND ENLARGEMENT), for storage of 1,310
<br />acre -feet of water, for irrigation, date of appropriation October 2, 1906, date of adjudication
<br />(conditional) October 3, 1921, in Civil Action 1414, District Court, in and for Huerfano County,
<br />located in Section 17, Township 26 South, Range 66 West, 6th PM, Huerfano County, Colorado,
<br />sources The Huerfano River and Greasewood Arroyo, and the conditional right partly made absolute
<br />November 1, 1960 (320 acre -feet) and April 2, 1962 (990 acre -feet) (Priority No. 367 1/2).
<br />Together with the Orlando Canal No. 3 and the Greasewood Arroyo Diverting Canal,
<br />described as follows:
<br />IV) That the headgate of the Orlando Canal No. 3, is located at a point on the North bank of
<br />the Huerfano River, from whence the West quarter corner of Section 25, Township 26 South, Range
<br />66 West of the 6 1 PM, bears North 68° 3' West 973 feet, said canal having a carrying capacity of 130
<br />cubic feet of water per second of time.
<br />V) That the headgate of the Greasewood Arroya Diverting Canal, is located at a point on the
<br />said Greasewood Arroya, from whence the Northeast corner of Section 18, Township 26 South,
<br />Range 66 West of the 6th PM, bears North 681 3' East 2920 feet, said canal having a carrying
<br />capacity of 1,500 cubic feet of water per second of time. Together with all ditches, ditch rights,
<br />easements, rights of way, and appurtenances, including headgates, measuring devices, and other
<br />fixtures thereon.
<br />
|