Laserfiche WebLink
6 EXHIBIT C <br />S..h..DL.._ A <br />COLORADO WATER CONISERVA -ON BOARD <br />CONS:'RUC-'ION FUND PROGRAM PRO2EDJRES <br />1. Board approval of enc ineer ing firm and eng ineerinc <br />agreement between encineerinc firm and project sponsor. <br />2. Preparation of detaiied plans and spec"'cat" ors for <br />authorized projects by consulting encineerinc fir^;. <br />3. ADDroval of detaiied plans and specifications by Board <br />staff (plans and specifications for storaa_e dams and <br />reservoirs must also be approved by State Encineer's <br />office). <br />4. Board staff approval of bidding for the project. Board <br />staff present at bid opening for construction.. <br />Project sponsor may issue the notice of award and the <br />notice to proceed with construction to the contractor <br />(both notices must be approved by the Board staff before <br />they are issued) . <br />b. Conduct z pre- construction conference. A:=rova_ of <br />construction schedule by Board staff. <br />7. Construction commences. The Board staff makes periodic <br />inspections during construction. Al- caanoe orders must <br />be approved by the Board staff in advance and befcre an_v. . <br />construction on change items can commence. Emergency <br />iter:s cleared by telephone . <br />E. The consul ring encineer cer_ -f Les Chet the -t <br />_ - �cj e :.as <br />been c =, =1 eted according to aDproved dra winas an.. <br />specifications and arranges for final i^ =pect o-. <br />c r <br />Baa' l inspection and acceptance cf as- ..___. *, - ^sec- by <br />Board staff. . <br />l0. Submittal of as -built 6-rawincs to Board -staff far <br />appr ova: and f <br />EXHIBIT C <br />• 1D2 <br />sched/ a <br />