My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150332 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150332 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 8:25:16 AM
Creation date
3/29/2012 8:13:29 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-033
C150332
Contractor Name
Terrace Irrigation Company
Contract Type
Loan
Water District
3
County
Conejos
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Implementation Schedule <br />This project has been ongoing upon the award of the Summitville Natural Resource Damage <br />Settlement. Phase 1 has already been completed. <br />Table 3. _ <br />Phase I <br />Planning (already funded by NRDS) <br />Previous studies - mapping, surveying, and hydrology <br />.(only did hydrology) <br />Complete Final Design <br />Phase II <br />Implementation <br />13- Oct -11 <br />NRDS Approval of $2 million <br />8- Nov -11 <br />RGBRT Proposal $25K Basin, $1,475,000 from Statewide fund <br />1- Dec -11 <br />Submit Final Design to SEO - 6 months <br />31- Dec -11 <br />Terrace Shareholders Approve CWCB Loan strategy <br />1- Mar -12 <br />CWCB Review and Approval <br />1- Jan -12. <br />Environmental Permitting Process begins (4 -5 months review) <br />1- May -12 <br />SEO Approval of final Design <br />1-May-121 <br />Environmental Permit Received <br />1- May -12 <br />Construction Bid Process can Proceed (2 months) <br />1- Jun -121 <br />CWCB Notice to Proceed <br />1- Jul -12' <br />Construction Begins <br />31- Dec -12 <br />Project Complete <br />Permitting <br />There are two permits that are required for this project, the NEPA and Army Corp of Engineers. <br />The BLM is working on the NEPA permit and URS is working on the proper army Corp permit. <br />We expect these permits to be completed by the first of May. <br />Funding Sources <br />$1,500,000 — Rio Grande Basin & Statewide WSRA funds <br />$2,000,000 — Natural Resources Damages Fund <br />$ 920,000 — TIC Loan <br />Credit Worthiness <br />TIC assesses shareholder fees annually (December 1) based on the projected operating costs and <br />debt service. TIC has three outstanding loans with the CWCB dating back to 1982. (See <br />Appendix D) All three of these loans are in good standing with the CWCB. Our intent is to <br />consolidate these three loans plus an additional $1,000,000 to complete the Spillway <br />Replacement project into one loan. Two years of financial statements are included with this <br />application. (See Appendix E) <br />4 <br />