CONTRACT CHANGE ORDER Order No.: One(1) <br /> Date: April 10,2012 <br /> State: Colorado <br /> Contract For: Bid Schedule 1,Tunnel Rehabilitation County: Delta <br /> Owner: North Delta Irrigation Company <br /> To Petty Construction Company <br /> (Contractor) <br /> You are hereby requester'to comply with the following changes f cn i thgcontract plans and specifications: , <br /> Description of Changes DECREASE INCREASE <br /> (Supplemental Plans and Specifications Attached) in Contract Price in Contract Price <br /> Based on the length of drill steel for reaming,and field verification $15,000.00 <br /> of the actual inside length of the tunnel to be sliplined,an additional <br /> 50 L.F.of 54-inch DR17 HDPE pipe is added to the project,but not <br /> at the unit Bid Price. Payment to be based on supply and delivery of <br /> the pipe material,with cost for the additional heat fused joint and <br /> installation considered incidental to the Work. Additional length of <br /> pipe is necessary in order to facilitate and stage equipment for heat <br /> fused joint production sufficiently beyond the tunnel inlet portal,and <br /> to facilitate and stage equipment for pulling fused pipe segments <br /> through the tunnel. Pipe is to be pulled through the tunnel to the <br /> limits of the final required location of the east eccentric transition <br /> coupling,to be field verified. Pipe stubbed out the west tunnel <br /> portal shall be cut and removed if it extends beyond the final <br /> required location of the west eccentric transition coupling,also to be <br /> field verified. <br /> TOTALS $0.00 $15,000.00 <br /> NET CHANGE IN CONTRACT PRICE $0.00 $15,000.00 <br /> JUSTIFICATION: Reaming operations identified approximately 30 L P.additional length of drill steel is needed <br /> between boring machine and the work staging area on one side of the tunnel to the working and staging area at <br /> opposite end of tunnel. Pipe is fabricated in 50-foot segments,and one full segment of pipe is requested. <br /> Previous Total Contract Price: $1,220,770.00 <br /> The amount of the Contract will be(Decreased)(Increased)by the Sum of Fifteen Thousand and no/10--- <br /> -- ------- -- • -- Dollars $15,000.00 <br /> The Contract Total including this and previous change Orders will be: One Million,Two Hundred Thirty <br /> Five Thousand,Seven Hundred Seventy and no/10---- - Dollars $1,235,770.0 <br /> The Contract Period Provided for Completion will be (Unchanged):Zero(0) Days. <br /> This document will become a su lenient to the contract and all provisions will apply hereto. <br /> Requested /1-X-",-1- _ sr• <br /> Recommended .� a+ —ti 411 s%. APIA .►�. <br /> Accepted <br /> t l•wner's hitect/Engineer) _/ e) <br /> (Contractor) (Date) <br /> Approved <br /> (Date) <br /> CF-6 z w Dees Inieen rectaewagcan.wpd <br />