My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150329 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150329 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 8:10:26 AM
Creation date
2/7/2012 10:56:28 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150329
Contractor Name
La Veta, Town of
Contract Type
Loan
Water District
2
County
Huerfano
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3441 <br />Fax: (303) 866 -4474 <br />www.cwcb.state.co.us <br />DATE: January 13, 2012 (Updated January 31, 2012) <br />SUBJECT: Agenda Item 26a, January 23 -24, 2012 Board Meeting <br />Finance Section — Construction Fund - New Loan <br />Town of La Veta — North Lake Dam Rehabilitation Project <br />Introduction <br />The Town of La Veta (Town) is applying for a loan for the North Lake Dam Rehabilitation Project <br />(Project). The purpose of the Project is to rehabilitate the Town's North Lake Reservoir (North <br />Lake), to remove the 2.5 -foot restriction imposed by the State Engineer's Office (SEO). The loan <br />request is for 90% of the estimated $410,000 total cost of the Project. See attached Project Data <br />Sheet for a location map and project summary. <br />Staff Recommendation (Board approved staff recommendation on January 24, 2012) <br />Staff recommends the Board approve a loan, from the Construction Fund, not to exceed $372,690 <br />($369,000 for project costs and $3,690 for the 1% Loan Service Fee) to the Town of La Veta, acting <br />by and through its Water Enterprise, for the North Lake Dam Rehabilitation Project. The loan <br />terms shall be 30 years at the low - income municipal restricted reservoir interest rate of 3.00% per <br />annum. Security for the loan shall be in compliance with CWCB Financial Policy #5. <br />Background <br />The Town is located in Huerfano County, along the Cucharas River (River) and the foothills of the <br />Sangre De Cristo mountain range in southeastern Colorado. Raw water diverted from the River is <br />the primary source for the Town's municipal water supply. North Lake is one of two reservoirs the <br />Town utilizes for raw water storage. The Town is dependent on storage to supplement river flows <br />during drought conditions and periods of low flow in the River. <br />On March 4, 2011, growing concerns over the safety of the North Lake dam resulted in the SEO <br />issuing the Town a restriction order to lower the North Lake water level 2.5 -feet below its normal <br />storage elevation. The primary concerns were outlet pipe deterioration, seepage on the downstream <br />Interstate & Federal • Watershed & Flood Protection • Stream & Lake Protection • Finance <br />Water Information • Water Conservation & Drought Planning • Water Supply Planning <br />John W. Hickenlooper <br />Governor <br />TO: Colorado Water Conservation Board Members <br />Mike King <br />DNR Executive Director <br />FROM: Ryan Edwards, P.E., Project Manager/_M& <br />Kirk Russell P.E. Chief <br />> > f <br />Jennifer L. Gimbel <br />CWCB Director <br />Finance Section <br />DATE: January 13, 2012 (Updated January 31, 2012) <br />SUBJECT: Agenda Item 26a, January 23 -24, 2012 Board Meeting <br />Finance Section — Construction Fund - New Loan <br />Town of La Veta — North Lake Dam Rehabilitation Project <br />Introduction <br />The Town of La Veta (Town) is applying for a loan for the North Lake Dam Rehabilitation Project <br />(Project). The purpose of the Project is to rehabilitate the Town's North Lake Reservoir (North <br />Lake), to remove the 2.5 -foot restriction imposed by the State Engineer's Office (SEO). The loan <br />request is for 90% of the estimated $410,000 total cost of the Project. See attached Project Data <br />Sheet for a location map and project summary. <br />Staff Recommendation (Board approved staff recommendation on January 24, 2012) <br />Staff recommends the Board approve a loan, from the Construction Fund, not to exceed $372,690 <br />($369,000 for project costs and $3,690 for the 1% Loan Service Fee) to the Town of La Veta, acting <br />by and through its Water Enterprise, for the North Lake Dam Rehabilitation Project. The loan <br />terms shall be 30 years at the low - income municipal restricted reservoir interest rate of 3.00% per <br />annum. Security for the loan shall be in compliance with CWCB Financial Policy #5. <br />Background <br />The Town is located in Huerfano County, along the Cucharas River (River) and the foothills of the <br />Sangre De Cristo mountain range in southeastern Colorado. Raw water diverted from the River is <br />the primary source for the Town's municipal water supply. North Lake is one of two reservoirs the <br />Town utilizes for raw water storage. The Town is dependent on storage to supplement river flows <br />during drought conditions and periods of low flow in the River. <br />On March 4, 2011, growing concerns over the safety of the North Lake dam resulted in the SEO <br />issuing the Town a restriction order to lower the North Lake water level 2.5 -feet below its normal <br />storage elevation. The primary concerns were outlet pipe deterioration, seepage on the downstream <br />Interstate & Federal • Watershed & Flood Protection • Stream & Lake Protection • Finance <br />Water Information • Water Conservation & Drought Planning • Water Supply Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.