Laserfiche WebLink
WINDSOR RESERVOIR AND CANAL COMPANY <br />Windsor Reservoir Completed <br />This project involved the Windsor Reservoir & Canal Company (WRCC) recovering 620 <br />acre -feet of storage in their Windsor Reservoir No. 8 and No. 8 Annex, by excavating and <br />removing up to 1,000,000 cubic yards of sediment. The WRCC service area extends from their <br />Cache la Poudre diversion north of Fort Collins east to near the town of Galeton northeast of <br />Greeley, generally bounded by the Eaton Ditch and the Greeley Ditch No. 2 Ditch. The total area <br />encompassed is about 86,000 acres, providing water for irrigation for about 55,000 acres. <br />Project construction commenced in April of 2003 and was shutdown for summer irrigation. The <br />project resumed in October/November of 2003 and was completed in November of 2004. <br />Sponsor: Windsor Res. /Canal Co. County: Larimer Water Source: Cache La Poudre <br />Terms of Loan: $681,750 @4.15% for 30 -yrs. Substantial Completion Date: February 1, 2005 <br />Design Engineer: Smith Geotechnical, Inc. - Fort Collins, Colorado <br />Construction Contractor: Barker Construction, Inc. - Ft. Collins, CO. <br />Annual Amount of Water Delivered = 30,000 Acre -Feet <br />