My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150288 Updated Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150288 Updated Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 8:10:39 AM
Creation date
2/7/2012 10:56:26 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150288
Contractor Name
Deuel and Snyder Improvement Company
Contract Type
Loan
Water District
1
County
Morgan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Construction Loan Program <br />Project Data Sheet <br />Borrower: Deuel and Snyder Improvement Company County: Morgan <br />Project Name: River Sand Gate Structure Project Project Type: Diversion Structure <br />Rehabilitation <br />Drainage Basin: South Platte/District 1 Water Source: South Platte River <br />Total Project Cost: $119,970 Funding Source: Severance Tax <br />Type of Borrower: Agricultural Average Diversion: 4,590 acre -feet <br />Loan Amount: $109,053 (including 1% service fee) Interest Rate: 2.5% Term: 30 years <br />(Increased from $90,900) <br />The Deuel and Snyder Improvement Company (Company) provides irrigation water to a 1,650 acre <br />service area located in Morgan County. The Company operates a sand gate located on a South Platte <br />River diversion structure. The sand gate is a vent section through the concrete rollover wall which is <br />boarded up when the Company needs to divert water. Boards must be removed during the winter to <br />allow excess sand (which builds up in front of the Company's diversion point) to wash down river. <br />Currently, in order to remove boards and open the gate, a Company employee must walk several <br />yards along the crest of the rollover wall to reach the sand gate. There is not a walkway or handrail <br />for safety. Because this is a major safety concern for the Company, it evaluated alternatives to both <br />improve the safety conditions for its employees and more efficiently operate the gate. The Company <br />has chosen to install a new bladder dam at its canal inlet to best control the volume of water entering <br />the canal and the sand issues. Construction is scheduled for January/February 2012. <br />i <br />T \ G f <br />.AtMeeKa, wnMaggn <br />Deuel and Snyder Canal <br />t,. 4 / `' .�'.��' �'"! / .�• • i � f ©A<MaAS�j �icxiiMROek�, eur4naon���` -:.' <br />_ �- <br />W <br />'� '.ia• �"" -�? _'."sG�`t-it.@.J2. e "I Mailt UvaY�lwlpwiaan.KNr f Y ���=c... <br />14 16, <br />�v'* /. ; ..... l,�{_ xn•.� M .. �B4m)" �Mmte Nata ji} k 1 r <br />{ _ wrgNtlA <br />�UiAN'�rwrara MM. •�� to �d�' -" ,.�" �.�� -._._- <br />NQW MM.9 T , .-. •on <br />�..✓ ` ^,: i .. Shdo / r�m Des Mdnetl ' <br />FeanOQ" <br />.. + 9 .4 � ef'.- t mk.w.oar..ww.w�•� s.wwNm, <br />M <br />4 <br />l <br />b <br />Fort Morgan <br />i <br />a <br />Location Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.