Laserfiche WebLink
Ridgway Reservoir Micro-Hydro Project Loan Feasibility <br />Page 24 of 42 <br />CWCB Water Project Loaa Application <br />�roiact fact sheet vrepared by �e Bureau of Reclamati4n. <br />6. Will the acquisition of addidonal water rights be necessary? YES <br />If YES, please explain. <br />1�i0 X <br />7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and <br />�tiarney(s). <br />NAME <br />finsineers <br />Bazry Butterfield <br />Stan Schwiessing <br />George Waldow <br />Attornev <br />Aaron Clay <br />ADDRESS and PHONE <br />HDR - Omaha, Nebraska <br />402-399-1061, barry.butterfield@hdxinc.com <br />HDR — Washington State <br />HDR — Minnesota <br />Tri-County Generai Counsel, Delta, Colorado <br />970-8749777, aaronclay@qwestaffice.net <br />8. List any feasibiliry studies or other investigations that have been compleied or are now in <br />progress for the proposed project. If so, submit one copy of the study with tlais application <br />Feasibility Re�rt prepared by HDR in August 2�9; Roadmap for Development and <br />Feasibility Repart preparod by HDR in May 2011 (see attached). <br />9. Estima#ed cost of the project. Please include estimated engineering costs, and estimated <br />construction c�sts, if lmown. <br />Estima#ed Engineering Costs:� $1,082,000 <br />Estirnated Construction Costs: $15,463,000 <br />Estimatec� Other Costs: <br />Estimated Total Costs: <br />_ $1,b27,004 (Construction Management and Administrative) <br />$1$,172,000 (Note: we suspect this to be a high estixnate) <br />