My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150324 feas study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150324 feas study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2014 4:27:52 PM
Creation date
10/7/2011 12:50:01 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150324
CT2015-037
Contractor Name
Tri-County Water Conservancy District
Contract Type
Loan
Water District
68
County
Montrose
Ouray
Delta
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ridgway Reservoir Micro-Hydro Project Loan Feasibility <br />Page 24 of 42 <br />CWCB Water Project Loaa Application <br />�roiact fact sheet vrepared by �e Bureau of Reclamati4n. <br />6. Will the acquisition of addidonal water rights be necessary? YES <br />If YES, please explain. <br />1�i0 X <br />7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and <br />�tiarney(s). <br />NAME <br />finsineers <br />Bazry Butterfield <br />Stan Schwiessing <br />George Waldow <br />Attornev <br />Aaron Clay <br />ADDRESS and PHONE <br />HDR - Omaha, Nebraska <br />402-399-1061, barry.butterfield@hdxinc.com <br />HDR — Washington State <br />HDR — Minnesota <br />Tri-County Generai Counsel, Delta, Colorado <br />970-8749777, aaronclay@qwestaffice.net <br />8. List any feasibiliry studies or other investigations that have been compleied or are now in <br />progress for the proposed project. If so, submit one copy of the study with tlais application <br />Feasibility Re�rt prepared by HDR in August 2�9; Roadmap for Development and <br />Feasibility Repart preparod by HDR in May 2011 (see attached). <br />9. Estima#ed cost of the project. Please include estimated engineering costs, and estimated <br />construction c�sts, if lmown. <br />Estima#ed Engineering Costs:� $1,082,000 <br />Estirnated Construction Costs: $15,463,000 <br />Estimatec� Other Costs: <br />Estimated Total Costs: <br />_ $1,b27,004 (Construction Management and Administrative) <br />$1$,172,000 (Note: we suspect this to be a high estixnate) <br />
The URL can be used to link to this page
Your browser does not support the video tag.