Laserfiche WebLink
Tri-County Water Conservancy Qistrict Agaida Item 20c <br />September 2, 2011 (t7pdated Ssptsmber t9, 2611) <br />Page 4 af i <br />The initial study conducted by the Bureau canciuded that thc addition of a hydropower facility <br />would have rninirnai impact on the local or regiona� environment. More recent evatuations sUpport <br />that conclusion and anticipate environmental and bialogical impacts wouid be canfined ta the <br />construction phase because the Project will be located within the area already disturbed by the dam, <br />where sensitive habitats have nnt been observed. Anticipated environmental innpacts consist of <br />noise, dust and minor soil erasion attributed to site excavation. Mitigation rneasures wili be <br />implemen#ed in accordance with iocal and federal guidelines in an effort to minimize environmental <br />impacts throughout construction. Foilowing construction, there are no lasting environmcntal <br />impacts expected. <br />The Project will be fundec! through a cambinatian of cash reserves from #he District, financing <br />through the CWCB and Colorado Water Resources and Power Development .�uthority <br />(CWRPDA), and Qualified Energy Canservation Bonds (QECB) throagh the Gaven�or's Energy <br />4ffiee (GEO). Fluctuatians in project variables, particularly materials and labor costs, have <br />resulted in tatal cost estimates varying frorn $i3AM to nearly $18.2M. A total project cost estimate <br />of $18,172,000 has been used in the financial analysis. A summary of proje�t costs is provided in <br />Table 2. <br />T <br />Engineering <br />Materiais/Construction Costs <br />PROJECT <br />Administrative/Permitting Expenses <br />Contingency (2Q%) <br />Total <br />$1,082,Ofl0 <br />$12,463,000 <br />$1,627,OOQ <br />� <br />$3,000,000 <br />$18,172,000 <br />Project construction is scheduled to begin in Spring 2012, starting with the ordering of items that <br />require long Iead times, such as the turbine/generatar equipment, butterfly valves and bifurcation <br />iittings. It is estimated that the construction phase af the Project will take 2 years to complete, with <br />energy production scheduled to commencs in 20i4. <br />CWCB wili nnt disperse any funds unril atl Colorado Water Resources and Power Development <br />Autharity funds have been fully expended. Following expenditure of CWRPDA funding, the <br />CWCB will rsimbwse project costs at 94%, up to a project total of �9,0�4,000. <br />Fi�anefat Analysis <br />The Dismic# quali�es for the hydroelectric interest rate of 2.flQ°lo for a 30-year term. Table 3 <br />provides a summary of the financial criteria of the loan request. <br />