My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150138 feas study
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150138 feas study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2011 8:51:35 AM
Creation date
10/5/2011 10:51:46 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150138
Contractor Name
Supply Irrigating Ditch Company
Contract Type
Loan
Water District
0
County
Boulder
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10. Improve the outlet ditch to the Supply Ditch to the north of the project site. <br />Approximately 2,000 linear feet of the ditch will be shaped, compacted, and <br />improved and approximately 650 linear feet of the ditch will be concrete lined due <br />to sandy and gravelly soils. <br />The Construction cost to complete the repairs indicated above for Alternative 1 is estimated to be <br />$ 566,000. The complete breakdown of the cost for Alternative 1 is shown in Table 3 and Table <br />5 of this report. <br />Alternative 2- Raise Dam Crest To Gage Height 25 feet. <br />Alternative 2 is similar to Alternative 1 in all respects except the crest of the dam will be raised <br />approximately five feet in elevation from gage height 20 feet to gage height 25 feet. This increases <br />the reservoir storage to approximately 360 acre-feet. Figure 3 shows the modifications to the dam <br />cross sections to allow the dam to be raised to gage height 25 feet. <br />' The Construction cost to complete the repairs indicated above for Alternative 2 is estimated to be <br />$ 1,116,000. The complete breakdown of the cost for Alternative 1 is shown in Table 3 and Table <br />6 of this report. <br />I' Alternative 3- Raise Dam Crest To Gage Height 30 feet. <br />� Alternative 3 is similar to Alternatives 1 and 2 in all respects except the crest of the dam will be <br />raised approximately ten feet in elevation from gage height 20 feet to gage height 30 feet. This <br />' increases the reservoir storage to approximately 540 acre-feet. Figure 4 shows the modifications <br />to the dam cross sections to allow the dam to be raised to gage height 30 feet. <br />' The Construction cost to complete the repairs indicated above for Alternative 3 is estimated to be <br />$1,740,500. The complete breakdown of the cost for Alternative 1 is shown in Table 3 and Table <br />7 of this report. <br />�J <br />C <br />' <br />' <br />, <br />� <br />COST ESTIMATE <br />The complete breakdown of the cost of the work proposed for each alternative is shown in Tables <br />5, 6, and 7. The costs are based on our past experience with similar projects and also from data <br />supplied by local contractors and suppliers. Quantities were based on a topographic map of the <br />reservoir site provided to us by the Supply Irrigating Ditch Company. <br />A summary of the costs for the three alternatives, including the engineering fees and <br />contingencies, is shown in the following table. <br />Knoth Reservoir-Feasibility Study Page g <br />
The URL can be used to link to this page
Your browser does not support the video tag.