Laserfiche WebLink
Vague Canyon Ditch/Holman Spring greater than those uses acknowledged above shall <br />be junior to the instream flow water right approved herein. <br />19. Except as provided above in Paragraph 18 under C.R.S. § 37- 92- 102(3)(b), the <br />La Sal Creek instream flow water right decreed herein shall be administered as having <br />been filed in 2002 and shall be administered subject to the prior appropriation system in <br />relation to all other water rights. As between all rights filed in the same calendar year, <br />priorities shall be determined by historical date of appropriation and not affected by the <br />date of entry of ruling. <br />20. Except as provided above in Paragraph 18, the application of C.R.S. § 37-92 - <br />102(3)(b) shall not result in general subordination of the La Sal Creek instream flow <br />right decreed herein to any other junior water right. <br />21. The Applicant shall install and maintain such measuring devices and keep such <br />records as the Division Engineer may require for administration of this right. <br />It is accordingly ORDERED that this Ruling shall be filed with the water clerk subject <br />to judicial review. <br />It is further ORDERED that a copy of this Ruling shall be filed with the Division <br />Engineer and the State Engineer. <br />Dated this 17th day of September, 2010. <br />BY THE REFEREE <br />Ivater Refere <br />Water Division No. 4 <br />State of Colorado <br />No protest was filed in this matter. The foregoing Ruling is confirmed and approved, and is <br />made the Judgment and Decree of this Court. <br />GAO <br />Dated this <br />day of <br />, 2010. <br />BY THE CO RT <br />War Judge <br />ater Division No. 4 <br />State of Colorado <br />