My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB San Miguel PHS Final
CWCB
>
Instream Flow Appropriations
>
DayForward
>
1-1000
>
CWCB San Miguel PHS Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2016 11:39:23 PM
Creation date
8/23/2011 9:03:15 AM
Metadata
Fields
Template:
Instream Flow Appropriations
Case Number
11CW0129
Stream Name
San Miguel River
Watershed
San Miguel
Water Division
4
Water District
60
County
Montrose
Instream Flow App - Doc Type
ISF INV - Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
987
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
determination that, to protect the natural environment to a reasonable degree, it would suffice <br />to appropriate minimum stream flows that would maintain the existing aquatic habitat and <br />related fish production when the determination is not shown to be irrational or unfounded. <br />Id. at 577. <br />In determining the minimum amount of water necessary to preserve the natural environment <br />to a reasonable degree in this case, the CWCB will rely upon recommendations from Staff, <br />the CDOW and the BLM. The CWCB staff, CDOW, and the BLM have cooperated in <br />developing instream flow recommendations based on PHABSIM analysis, as well as <br />standard field and office procedures including, but not limited to, collecting hydraulic and <br />biologic data, surveying stream channel geometry, modeling instream hydraulic parameters, <br />and analyzing water availability using gage flows and statistical stream flow modeling. The <br />determination of the minimum amount of water necessary to preserve the natural <br />environment is properly based on the scientific expertise of Staff, Wildlife, and the BLM, <br />and will be supported by the evidence at the hearing in this matter. <br />7) Staff reserves the right to supplement its legal claims in its Rebuttal Statement. <br />C. EXHIBITS TO BE INTRODUCED AT HEARING <br />1) January 14, 2011 Memorandum from Jeff Baessler to the CWCB, Agenda Item 15, containing <br />the stream flow tabulation for the San Miguel River ISF and Staff's request that the Board <br />form its intent to appropriate, attached as Exhibit 1. <br />2) Letter from the CDOW, dated December 10, 2010 and letter from BLM dated December 15, <br />2010, along with supporting field data, photographs, maps, gage data and water availability <br />analysis, attached as Exhibit 2. <br />Appendix A 3 Species Conservation Agreement <br />Appendix B CNHP Site Report SMR at Tabeguache Creek <br />Appendix B CNHP Site Report Uravan West <br />Appendix C Fish Survey SMR at Uravan 2008 <br />Appendix D Macroinvertebrate report <br />Appendix E PHABSIM 15000 <br />Appendix F Anderson F289RG (Riverine Fish Flow Investigations) <br />Appendix G R2X <br />Appendix H LOG Regression RHABSIM Staging Tables <br />Appendix H R2X Staging Tables <br />Appendix I Final Report Cooper & Conovitz 2000 <br />Appendix J SMR ISF Hydrograph <br />Appendix K CDOW/BLM San Miguel Draft Exec summary <br />Appendix L Dolores River Fish Survey <br />3) The CWCB Staff recommendation and executive summary containing the written <br />recommendation for an instream flow appropriation on the San Miguel River, attached as <br />Exhibit 3. All or portions of the digital Microsoft Excel worksheets that were developed as <br />part of staff hydrologic analyses may also be used as exhibits. These digital Excel files can be <br />requested directly from CWCB staff. <br />
The URL can be used to link to this page
Your browser does not support the video tag.