Laserfiche WebLink
Ezhibit A <br />Water Supply Reserve Account — Grant and Loan Program <br />Scope of Work <br />WATER ACTIVITY NAME — Halligan - Seaman Water Management Project: Shared Vision <br />Planning Model <br />GRANT RECIPIENT — City of Greeley <br />FUNDING SOURCE - South Platte Basin Account -$25,435; Statewide Account -$76,305 <br />Matching Funds: $271,109 ($212,066 cash match and $59,043 in-kind) - The Halligan-Seaman <br />Water Management Project applicants are providing $112,638; The Nature Conservancy is <br />providing $34,326; CSU is providing $9,144; and Bill Werick and the Western States Watershed <br />Study is providing $} 1 S,Q00 in �ash match and in-kind services for facilitatian and model <br />oversight. <br />BACKGROUND (Provide a background and descripiion of the project) <br />The Halligan-�eaman Water Management Project (HSWMP) participants are seeking permit <br />authorization from the Army Corps of Engineers to enlarge Halligan and Seaman Reservoirs. <br />Bath reservoirs are located on the North FQrk of the Cache la Poudre River. The HSWMP has <br />been awarded a Water Supply Reserve Account (WSR.A) grant to develop a shared vision <br />planning (SVP) process to improve stream flows in the North Fork of the Cache la Poudre and <br />mainstem Cache la Poudre above the confluence of the North Fork. This SVP process centers <br />around a series of workshops and an interactive shared vision computer model (SV1Vn that can <br />incorporate operational, hydrolagic, water rights, flow recommendations, and criteria for <br />ecological and biological components into a river flow regime in order to fully assess reservoir <br />operations alternatives. <br />Funding from the WSRA will focus on the development of the SVM. The model will be built <br />collaboratively to a11ow evaluation of the alternatives to see how well they meet consumptive <br />and non-consumptive use needs of the participating stakeholders. The major deliverable will be a <br />shared vision model that includes water righ�s components, water operational and hydrologic <br />components, ecological and biological criteria. <br />Si;I�vIMARY OF TASKS (Describe each tasl� the method or procedure that will be used to <br />accomplish the tas7� who wild undertake the tasl� and a description of the deliverables that will <br />be produced upon successful completion of the task) <br />Task l: Develop the SV'M including the analysis of hydrologic conditions, <br />project water rights, and reservoir operations. <br />Accomplishing Task 1 will require the collection and compilation of HSWMP participant data <br />associated with water rights, water operations and hydrologic components for submittal and <br />input into the SVM. This data and associated components will be obta.ined from the MODSIM <br />