Laserfiche WebLink
. <br />.� <br />IN WITNESS WHEREOF, the parties hereto have executed this contract on the day first above <br />written. <br />CONTRACTOR: SAN LUIS VALLEY <br />IRRIGATION DISTRICT <br />._. <br />By <br />David Graham, President <br />Federal ID Number: 84-6002934 <br />(Seal) <br />A <br />: <br />..� <br />TTEST: <br />� � � � �� �� <br />.� �it <br />Ja�i Evans, Board Secretary <br />STATE OF COLORADO <br />Bill Ritter, J Governor <br />By <br />For the Executive Director <br />Department of Natural Resources <br />Colorado Water Conservation Board <br />Rod Kuharich, Director <br />Legal Review: <br />.IOHN W. SUTHERS, ATTORNEY GENERAL <br />By �/ � <br />ALL CONTRACTS MUST BE APPROVED BY THE STATE CONTROLLER <br />CRS 24-30-202 requires that the State Controller approve all state contracts. This <br />contract is not valid until the State Controller, or such assistant as he may delegate, <br />has signed it. The contractor is not authorized to begin performance until the contract <br />is signed and dated below. If performance begins prior to the date below, the State of <br />Colorado may not be obligated to pay for the goods and/or services provided. <br />Leslie M. Shenefelt, State Controller <br />By � G __ <br />Effective Date <br />�-- �--�� <br />Grant Contract No. C150402 <br />Page 7 of 7 <br />