Laserfiche WebLink
1'onn (i•AC-112A <br />. x-r,ti/PB . <br />�� , <br />� <br />U '�If.NI11RAliPNC��NAAtP. <br />er Conservation Ba. <br />C OMP U T E R UF:PAR'I MF.N 1 OR AG!'NCY NUMBIiN <br />MODELLING PDA <br />CON•I,1V'�I, RUU11N6 NVMNI?R � � � <br />$50,000 <br />1'IpS OpNfRACI', made this ��day of ____��L GG`� 199 2, by and betwcen the Slale of C:uloraJo for <br />theuseandbeaefitofl6eDe�sartmentof Natural Resour e� s <br />(Colorado Water Conservation Board), <br />beteinafterrefetredWastheStete,and Cone�os Water Conservaney District <br />318 r•iain St. , Manassa, CO 81141, <br />he�elofter referrcd to s the mnt�actor/Coolractor or BorY�ower . <br />WIILR[J1.S, authority e:ials in thc !aw anJ itunda have Ixen budgcic�, appmpriatcd anJ olhetwise madc awilablc and a <br />auflicient unencumbe�zd balance ther�of remains availnble for runJ Numl�ct 4 6 2 , Appn�priaticm �, /�, <br />Orgao'r►ation YYYY , Trogram WTRC �n��� r, C. �'�13 (D � 9, ; and <br />W�IEREAS, required a 1.� and coordination has <br />been accomplished from a ' h��p iate agencies; and <br />WHEREAS, pursuant to the provisions of §37-60-119, Colorado <br />Revised Statutes, the State is authorized to loan money for the <br />construction of water projects for the benefit of the people of the <br />State oi Colorado; and <br />WHEREAS, the Contractor is a conservancy district in the State <br />of Colorado; and <br />WHEREAS, legislation is currently pending in the United States <br />Congress for the transfer of operation, maintenance and replacement <br />responsibilities for Platoro Dam and Reserve from the United States <br />to the Contractor; and <br />WHEREAS , the total proposed cost f or the Contractor to acquire <br />such responsibilities for Platoro Dam and Reservoir is $45A,000; <br />and <br />WHEREAS, pursuant to Senate Bill No. 15, First Session of the <br />Fifty-Sixth General Assembly of the State of Colorado duly enacted <br />into law, the Colorado Water Conservation Board has been authorized <br />to loan and grant the sum of $500,000, $400,000 of which is to be <br />reimbursed at 5� interest over 40 years, and $100,000 of which is <br />to be non-reimbursable to the Contractor, for the transfer of <br />operation, maintenance and replacement responsibilities for Platoro <br />Dam and Reservoir; and <br />WiiEREAS, pursuant to House Bill No. 1006 , First Session of the <br />Fifty-Eighth General Assembly of the State of Colorado duly enacted <br />into law, amending Senate Bill No. 15, the Colorado Water <br />Conservation Board has been authorized to expend up to $50, 000 from <br />the loan portion of the total authorization for preparation of an <br />operational model as the basis for an operating agreement for <br />Platoro Dam and Reservoir between the Contractor and the State <br />Engineer; <br />