My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rio Grande - Platoro Reservoir Restoration_Completion Letter
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
Rio Grande - Platoro Reservoir Restoration_Completion Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2017 12:33:09 PM
Creation date
8/11/2011 1:54:28 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Rio Grande
Applicant
Conejos Water Conservancy District
Description
Platoro Reservoir Restoration
Account Source
Basin & Statewide
Board Meeting Date
9/17/2008
Contract/PO #
C150448
WSRA - Doc Type
Project Completion Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br />The next day testing was done from the District's office in Manassa, CO. the system worked <br />great and the District again had a remote control option for the valves in Platoro. <br />The following is the breakdown of the final costs for the complete project. The total amount is <br />higher than initially expected; this is due to the type of valves the Bureau of Reclamation <br />eventually required and approved and some necessary changes to design due to application. <br />Phase I <br />Description <br />engineering <br />safety <br />Mobilization <br />labor <br />equip. rental <br />Material <br />per diem <br />Total PHASE 1 <br />TOTAL COST <br />Financial Summary all Phases <br />Costs <br />$ 10,000.00 <br />$ 2,500.00 <br />$ 11,000.00 <br />$ 60,000.00 <br />$ 12,000.00 <br />$ 55,000.00 <br />$ 7,000.00 <br />$ 157,500.00 <br />$ 157,500.00I <br />Phase III <br />Description <br />engineering <br />contract award <br />materials <br />const./testing <br />mobilization <br />R&R valves <br />Elec./Programming <br />Total Phase lll <br />TOTAL COST- ALL PHASES <br />Colorado Water Conservation Board <br />Conejos Water Conservancy District <br />TOTAL <br />Phase II <br />Description <br />en�ineerin� <br />safety equip <br />Mobilization <br />Labor <br />equipment <br />Material <br />consultant <br />Tota/ Phase ll <br />PHASE I+ Phase II <br />Costs <br />$ 12,000.00 <br />$ 21,000.00 <br />$ 103,000.00 <br />$ 304,000.00 <br />$ 8,000.00 <br />$ 68,064.00 <br />$ 22,261.00 <br />$ 538,325.00 <br />�_.798.525.00 <br />� 250,000.00 <br />$ 548,525.00 <br />$ 798,525.00 <br />Costs <br />$ 13,000.00 <br />$ 25,000.00 <br />$ 10,000.00 <br />$ 100,000.00 <br />$ 44,000.00 <br />$ 63,100.00 <br />$ 5,100.00 <br />$ 260,200.00 <br />$ 417,700.00 <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.