My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado - Off-Channel Reservoir Sites in Crystal River Watershed_Statement of Work
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Colorado - Off-Channel Reservoir Sites in Crystal River Watershed_Statement of Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2012 1:17:42 PM
Creation date
8/11/2011 1:44:48 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Colorado
Applicant
West Divide Water Conservancy District
Description
Feasibility and Design Assessment of Off-Channel Reservoir Sites in the Crystal River Watershed
Account Source
Basin
Board Meeting Date
9/17/2008
Contract/PO #
09000000052
WSRA - Doc Type
Supporting Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />West Divide Board of Directors <br />September 30, 2008 <br />Page 5 <br />. <br />Table 1 <br />Project Schedule <br />C stal River Pro'ect <br />Work Task Time for Task Completion <br />Task 1—Topo Survey Effort will take one month <br />Task 2— Identify Storage Alternatives Effort will take two months <br />Task 3— Screen Storage Alternatives Effort will take one month <br />Task 4— Preliminary Design Effort will take one month <br />Task 5— Construction Cost Estimates Effort will take one month <br />Task 6— Water Rights and Water Supply Effort will take one month <br />Task 7— Environmental and Permitting Effort will take one month <br />Task 8— Re ort Pr aration / Deliverables Effort will take one month <br />STUDY COST <br />We estimate a total project cost of $55,000. The cost estimates are summarized in Table 2 below. We <br />propose to bill on a time and materials basis, pursuant to the current rate schedule of each consultant. <br />Table 2 <br />Project Costs <br />C stal River Pro'ect <br />Work Task Grand River So ris ERO Sub-Total <br />Task 1— Topo Survey $ - $ 11,500 $ - $ 11,500 <br />Task 2— Identify Storage Alts. $ 3,000 $ 500 $ - $ 3,500 <br />Task 3— Screen Storage Alts. $ 3,000 $ 500 $ - $ 3,500 <br />Task 4— Preliminary Design $ - $ 14,850 $ - $ 14,850 <br />Task 5— Construction Cost Estimates $ - $ 6,650 $ - $ 6,650 <br />Task 6— Water Rights and Water Supply $ 4,800 $ - $ - $ 4,800 <br />Task 7— Environmental and Permitting $ 2,200 $ - $ 5,000 $ 7,200 <br />Task 8— Report Preparation / Deliverables $ 3,000 $ - $ - $ 3,000 <br />Pro' ect Mana ement $ - � - $ ' $ ' <br />Tota1= $ 16,000 $ 34,000 $ 5,000 $ 55,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.