My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado - Off-Channel Reservoir Sites in Crystal River Watershed_Statement of Work
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Colorado - Off-Channel Reservoir Sites in Crystal River Watershed_Statement of Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2012 1:17:42 PM
Creation date
8/11/2011 1:44:48 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Colorado
Applicant
West Divide Water Conservancy District
Description
Feasibility and Design Assessment of Off-Channel Reservoir Sites in the Crystal River Watershed
Account Source
Basin
Board Meeting Date
9/17/2008
Contract/PO #
09000000052
WSRA - Doc Type
Supporting Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� � <br />Sopris Engi�eering, LLC <br />Schedule of Hourly Rates <br />Effective January, 2008 <br />Total project charges are based on hourly rates, plus direct job expenses as follows: <br />Personnel Charges <br />Principal Engineer, Principal Surveyor <br />Project Manager <br />Project Engineer (P.E.), Survey Manager (L.S.) <br />Design and/or Field Engineer, Survey Supervisor <br />Technician, Field Observer, Party Chief <br />Technical Typist, Clerical <br />Three-man Survey Crew <br />Twaman Survey Crew <br />Robotic Survey Crew <br />GPS Survey Crew <br />Courtroom Expert Testimony <br />Court and Deposition Preparation <br />Deposition <br />Computer Charges <br />Computer Plots <br />Online Research <br />Miscellaneous Charges <br />Photocopies <br />Blackline/Blueline prints <br />Mylar Sepias <br />Vehicle Mileage <br />Overnight Delivery (in state) <br />Overnight Delivery (out of state) <br />Custom Billing Forms <br />Outside Consultants or sub-Contractors <br />Other Direct Project E�cpenses <br />Travel Expenses: <br />Airfare, lodging, meals, car rental, telephone, parking fees, etc. <br />$17o.00/hr. <br />$120.00/hr. <br />$105.00/hr. <br />$90.00/hr. <br />$80.00/hr. <br />$50.00/hr. <br />$160.00/hr. <br />$140.00/hr. <br />$140.00/hr. <br />$180.00/l�r. <br />$250.00/hr. <br />$170.00/hr <br />$200.00/hr <br />$20.00/ea. <br />Additional $20.00/ hr <br />$o. l s/�. <br />$1.50/ea. <br />$20.00/ea. <br />$0.50/mi. <br />as charged <br />as charged <br />$20.00/hr <br />Billed at Our Cost plus 10% <br />Billed at Our Cost <br />502 Main Street • Suite A3 ' Carbondale, CO 81623 :(970) 704-0311 :' Fax (970) 704-0313 <br />PRI ENGINEERING • LLC �����consultants <br />SO S <br />
The URL can be used to link to this page
Your browser does not support the video tag.