My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado - Upper CO River Endangered Fish Recovery Program_Statement of Work
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Colorado - Upper CO River Endangered Fish Recovery Program_Statement of Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2012 1:40:27 PM
Creation date
8/9/2011 3:08:09 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Colorado
Applicant
Colorado River Water Conservation District
Description
Upper Colorado River Endangered Fish Recovery Program - Alternative Analysis
Account Source
Statewide
Board Meeting Date
3/13/2007
Contract/PO #
150404
WSRA - Doc Type
Supporting Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table of Contents <br />1.0 Background ...............................................................................................1 <br />1.1 Project Need ......................................................................................1 <br />1.2 Previous Investigations ..................................................................... ...1 <br />1.3 Current Investigations and Project Participants ........................................2 <br />1.4 Phase 2 Study Objectives .....................................................................2 <br />1.5 Evaluation Criteria .............................................................................3 <br />2.0 Study Team ...............................................................................................4 <br />3.0 Project Timeline .........................................................................................6 <br />4.0 Work Tasks ................................................................................................7 <br />4.1 Selection of 10825 Elements (Phase I Study) ..............................................7 <br />4.2 Stakeholder Communication ..................................................................8 <br />4.3 Collect and Review Existing Information .....................................................9 <br />4.4 Field Reconnaissance ...........................................................................10 <br />4.5 Legal and Institutional Issues .................................................................10 <br />4.6 Water Supply and Availability .............................................................10 <br />4.6.1 Structural Alternatives .........................................................10 <br />4.6.2 Non-structural Alternatives ....................................................12 <br />4.7 Feasibility Level Design and Cost Estimates (Structural Elements) ...............13 <br />4.7.1 Key Engineering Assumptions .......................................................14 <br />4.8 Initial Selection of Phase 2 Alternatives ..................................................16 <br />4.9 Environmental Evaluation ..................................................................16 <br />4.9.1 Stream Flow .......................................................................17 <br />4.9.2 Fisheries and Recreation ........................................................17 <br />4.9.3 Water Quality .....................................................................17 <br />4.9.4 General EnvironmentaUPermitting ..........................................18 <br />4.10 Final Selection of Phase 2 Alternatives ...................................................18 <br />4.11 Further Alternative Evaluation as Required ...........................................18 <br />4.12 Report Preparation ...........................................................................18 <br />5.0 Key Assumptions .......................................................................................20 <br />6.0 Deliverables .............................................................................................21 <br />7.0 Estimated Cost of Study ..............................................................................22 <br />Attachment 1: GEI Consultants: Preliminary matrix of tasks anticipated by alternative <br />Attachment 2: Grand River Consulting: Summary of Work <br />Attachment 3: Steering Committee List <br />Attachment 4: Resumes and Fees of Key Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.