My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Yampa - Grand Junction Energy Develop Water Needs Assessment_Supporting Documents
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
SOUTHWEST & YAMPA
>
Yampa - Grand Junction Energy Develop Water Needs Assessment_Supporting Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2012 12:59:39 PM
Creation date
8/8/2011 2:35:08 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Yampa/White
Additional Roundtables
Colorado
Applicant
City of Grand Junction Water Utility Enterprise Fund
Description
Colorado, White and Yampa River Basins Energy Development Water Needs Assessment
Account Source
Statewide
Board Meeting Date
3/13/2007
Contract/PO #
150407
WSRA - Doc Type
Supporting Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />i �� <br />C� <br />Task 3 Review Conditional Water Rights <br />The objective of this task is to compile a list of the conditional water rights in the <br />Colorado and White River Basins, specifically water districts 39, 43, 45, 70, and <br />potentially 72, identifying those rights which are currently owned by energy companies. <br />The other districts that are within the Yampa Basin are not over-appropriated so it is not <br />necessary to investigate the conditional water rights. <br />The existing matrix was completed during the reporting period per Phase 1 scope (see <br />comments below for Work Planned for the Next Invoice Period, Task 3). <br />Task 4 Project Management, Meetings and Coordination <br />The objective of this task is to provide the needed project management and <br />correspondence needed for the project. <br />The URS Team members attended the following meetings during the performance <br />period: <br />• February 15, 2008 Energy Sub-Committee Working Session, Glenwood Springs, <br />Colorado <br />• February 25, 2008 Colorado River Roundtable Meeting, Glenwood Springs, <br />Colorado <br />Ms. Fowler continues to communicate with the City of Grand Junction periodically for <br />contract questions and issues as they arise. <br />Work Planned for the Next Invoice Period <br />This section provides a summary of the action items for the next reporting period. <br />Task 1— Existing Data and Literature Search <br />Develop Draft Letter Report summarizing Phase l. <br />Task 2— Water Demand Scenario Development <br />Summarize initial scenario development in Draft Letter Report (Task 1). <br />Task 3— Review Conditional Water Rights <br />Additional work that can be completed for Phase 2 includes the identiiication of water <br />rights that serve as alternate points of diversion for other water rights. Summarize initial <br />water rights matrix information in Draft Letter Report (Task 1). <br />Task 4- Project Management, Meetings and Coordination <br />Develop Draft Letter Report for discussion during April Energy Sub-Committee Meeting. <br />URS Corporation <br />713 Cooper Avenue, Suitc 100 <br />Glemvood Springs, CO 81601 <br />
The URL can be used to link to this page
Your browser does not support the video tag.