Laserfiche WebLink
• <br />i �� <br />C� <br />Task 3 Review Conditional Water Rights <br />The objective of this task is to compile a list of the conditional water rights in the <br />Colorado and White River Basins, specifically water districts 39, 43, 45, 70, and <br />potentially 72, identifying those rights which are currently owned by energy companies. <br />The other districts that are within the Yampa Basin are not over-appropriated so it is not <br />necessary to investigate the conditional water rights. <br />The existing matrix was completed during the reporting period per Phase 1 scope (see <br />comments below for Work Planned for the Next Invoice Period, Task 3). <br />Task 4 Project Management, Meetings and Coordination <br />The objective of this task is to provide the needed project management and <br />correspondence needed for the project. <br />The URS Team members attended the following meetings during the performance <br />period: <br />• February 15, 2008 Energy Sub-Committee Working Session, Glenwood Springs, <br />Colorado <br />• February 25, 2008 Colorado River Roundtable Meeting, Glenwood Springs, <br />Colorado <br />Ms. Fowler continues to communicate with the City of Grand Junction periodically for <br />contract questions and issues as they arise. <br />Work Planned for the Next Invoice Period <br />This section provides a summary of the action items for the next reporting period. <br />Task 1— Existing Data and Literature Search <br />Develop Draft Letter Report summarizing Phase l. <br />Task 2— Water Demand Scenario Development <br />Summarize initial scenario development in Draft Letter Report (Task 1). <br />Task 3— Review Conditional Water Rights <br />Additional work that can be completed for Phase 2 includes the identiiication of water <br />rights that serve as alternate points of diversion for other water rights. Summarize initial <br />water rights matrix information in Draft Letter Report (Task 1). <br />Task 4- Project Management, Meetings and Coordination <br />Develop Draft Letter Report for discussion during April Energy Sub-Committee Meeting. <br />URS Corporation <br />713 Cooper Avenue, Suitc 100 <br />Glemvood Springs, CO 81601 <br />