My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado - Grand County Stream Flow Mgmt Plan Phase III_Statement of Work
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Colorado - Grand County Stream Flow Mgmt Plan Phase III_Statement of Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2013 3:13:57 PM
Creation date
8/8/2011 2:20:52 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Colorado
Applicant
Grand County
Description
Grand County Stream Flow Management Plan - Phase III
Account Source
Basin
Board Meeting Date
5/21/2008
Contract/PO #
150461
WSRA - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Draft Scope of Work <br />QUALIFICATION OF SERVICES <br />This section presents specific work items that are not part of the proposed Scope of Work. Performance <br />of these tasks could be executed at the request of the County. Additional services will be invoiced on an <br />hourly basis in conjunction with our current Fee Schedule. <br />1) Additional flow scenarios other than described in Section 3.4 <br />2) Participation in stakeholders work group except as outlined in Section 3.7 <br />3) Wetland delineations and mitigation design <br />�'-- r,• +..• + <br />"; � <br />5) Permitting <br />6) Floodplain mapping for FEMA submittals <br />7) Construction documents <br />8) Public meetings <br />9) Groundwater drainage analysis <br />10) Geotechnical and structural analyses <br />O Grand County Colorado TETRA TECH <br />Stream Management Plan, Phase 3B � <br />TETRA TECN <br />
The URL can be used to link to this page
Your browser does not support the video tag.