<br />TASK � DESCRIPTION
<br />Task 33 Assessment of Field Data
<br />3.3.1 Prepare figures, tables, photos
<br />3.3.2 Verify spawning habitat suitability curves with 2008 field data
<br />33.3 Compile PHABSIM analysis; run single cross section analysis
<br />3.3.4 Review flushing flows with field assessment
<br />3.3.5 Finalize flow-habitat relationships
<br />3.3.6 Update SMP
<br />Task 3.4 Assessment of Flow Regimes
<br />3.4.1 Flow regimes analysis
<br />3.4.1.1 Time series analysis
<br />3.4.1.2 Compaze available habitat
<br />3.4.1.3 Summarize differences
<br />3.4.2 Future flow regimes analysis
<br />3.4.2.1 Time series analvsis
<br />' 3.4.2.2 Compare available habitat
<br />3.4.2.3 Summarize differences
<br />3.4.2.4 Assess approach: restoration vs flow modifications
<br />Task 3.5 Restoration Opportunities
<br />3.5.1 Integrate stream assessment with environmental flow
<br />3.5.1.1 Field-based matrix
<br />3.5.1.2 Flow regime ranking
<br />3.5.1.3 Fish density and biomass data
<br />3.5.1.4 Combine previous results
<br />3.5.1.5 Update recreational flows (American Whitewater)
<br />3.5.1.6 Review other work
<br />3.5.1.7 Identify reaches for restoration
<br />3.5.1.8 Technical memorandum
<br />3.5.2 Physical Restoration Opportunities
<br />3.5.2.1 Conceptual Design Elements
<br />3.5.2.2 Restoration locations/projects
<br />3.5.2.3 Conceptual Plans-draft
<br />3.5.2.4 Conceptual Plans-finalize
<br />Task 3.6 Plan Implementation and Enforcement-NIC
<br />Task 3.7 Meetings and Coordination
<br />�a�
<br />$7,840.00
<br />$2,514.00
<br />$4,382.00
<br />$2,976.00
<br />$10,438.00
<br />$0.00
<br />$16,180.00
<br />$7,370.00
<br />$4,505.00
<br />$1,510.00
<br />$14,030.00
<br />$7,370.00
<br />$3,945.00
<br />$15,198.00
<br />$7,060.00
<br />$2,768.00
<br />$6,162.00
<br />$3,080.00
<br />$6,168.00
<br />$13,120.00
<br />$15,118.00
<br />$8,560.00
<br />$16,560.00
<br />$6,760.00
<br />$34,447.00
<br />CWCB Portion of project are tasks that will be completed after contact is signed, March 2010.
<br />CWCB PORTION
<br />$2,840.00
<br />$882.00
<br />$0.00
<br />$1,414.00
<br />$9,938.00
<br />$0.00
<br />$1,005.00
<br />$0.00
<br />$3,030.00
<br />$1,370.00
<br />$3,945.00,
<br />$5,198.00
<br />$5,060.00
<br />$3,884.00
<br />$2,768.00
<br />$3,162.00
<br />$3,080.00
<br />$3,010.00
<br />$3,168.00
<br />$10,620.00�
<br />$10,118.00
<br />$5,688.00
<br />$13,060.00
<br />$6,760.00
<br />$0.00