Laserfiche WebLink
v <br />Grand County Stream Management Plan - EXHIBIT B <br />Colorado Basin Roundtable <br />Water Supply Reserve Account Grant (Updated Info 2/23/10) <br />Colorado Water Conservation Board <br />TASK � DESCRIPTION <br />Task 33 Assessment of Field Data <br />3.3.1 Prepare figures, tables, photos <br />3.3.2 Verify spawning habitat suitability curves with 2008 field data <br />33.3 Compile PHABSIM analysis; run single cross section analysis <br />3.3.4 Review flushing flows with field assessment <br />3.3.5 Finalize flow-habitat relationships <br />3.3.6 Update SMP <br />Task 3.4 Assessment of Flow Regimes <br />3.4.1 Flow regimes analysis <br />3.4.1.1 Time series analysis <br />3.4.1.2 Compaze available habitat <br />3.4.1.3 Summarize differences <br />3.4.2 Future flow regimes analysis <br />3.4.2.1 Time series analvsis <br />' 3.4.2.2 Compare available habitat <br />3.4.2.3 Summarize differences <br />3.4.2.4 Assess approach: restoration vs flow modifications <br />Task 3.5 Restoration Opportunities <br />3.5.1 Integrate stream assessment with environmental flow <br />3.5.1.1 Field-based matrix <br />3.5.1.2 Flow regime ranking <br />3.5.1.3 Fish density and biomass data <br />3.5.1.4 Combine previous results <br />3.5.1.5 Update recreational flows (American Whitewater) <br />3.5.1.6 Review other work <br />3.5.1.7 Identify reaches for restoration <br />3.5.1.8 Technical memorandum <br />3.5.2 Physical Restoration Opportunities <br />3.5.2.1 Conceptual Design Elements <br />3.5.2.2 Restoration locations/projects <br />3.5.2.3 Conceptual Plans-draft <br />3.5.2.4 Conceptual Plans-finalize <br />Task 3.6 Plan Implementation and Enforcement-NIC <br />Task 3.7 Meetings and Coordination <br />�a� <br />$7,840.00 <br />$2,514.00 <br />$4,382.00 <br />$2,976.00 <br />$10,438.00 <br />$0.00 <br />$16,180.00 <br />$7,370.00 <br />$4,505.00 <br />$1,510.00 <br />$14,030.00 <br />$7,370.00 <br />$3,945.00 <br />$15,198.00 <br />$7,060.00 <br />$2,768.00 <br />$6,162.00 <br />$3,080.00 <br />$6,168.00 <br />$13,120.00 <br />$15,118.00 <br />$8,560.00 <br />$16,560.00 <br />$6,760.00 <br />$34,447.00 <br />CWCB Portion of project are tasks that will be completed after contact is signed, March 2010. <br />CWCB PORTION <br />$2,840.00 <br />$882.00 <br />$0.00 <br />$1,414.00 <br />$9,938.00 <br />$0.00 <br />$1,005.00 <br />$0.00 <br />$3,030.00 <br />$1,370.00 <br />$3,945.00, <br />$5,198.00 <br />$5,060.00 <br />$3,884.00 <br />$2,768.00 <br />$3,162.00 <br />$3,080.00 <br />$3,010.00 <br />$3,168.00 <br />$10,620.00� <br />$10,118.00 <br />$5,688.00 <br />$13,060.00 <br />$6,760.00 <br />$0.00 <br />