My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gunnison - Safety and Serviceability Needs Inventory for Reservoirs in Leroux Basin_Support Document
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Gunnison - Safety and Serviceability Needs Inventory for Reservoirs in Leroux Basin_Support Document
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2012 10:50:47 AM
Creation date
8/5/2011 10:51:56 AM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Gunnison
Applicant
Leroux Creek Water Users Association
Description
Safety and Serviceability Needs Inventory for Reservoirs in the Leroux Creek Drainage Basin
Account Source
Basin
Board Meeting Date
5/23/2007
Contract/PO #
08000000008
WSRA - Doc Type
Supporting Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br />� �� <br />� � � <br />� � <br />� <br />CONSULTlNG ENGINEERS/LAND SURVEYORS <br />� rnwncrwa. �.. 2150 Hwy. 6& 50, Grand Jur►C60�►, CO 8150�-9422 • 970/242-5202 • FAX 970/242•1672 <br />� <br />December 7, 2010 � <br />� <br />Todd Doherty � �� <br />Colorado Water Conservation Board � �I�� <br />Division of Water Conservation <br />1313 Sherman St., Room 721 <br />Denver, CO 80203 <br />RE: Safety and Serviceability Needs Inventory For Reservoirs in the Leroux Creek <br />Drainage Basin <br />Todd: <br />Work is continuing on the above project. However, it is behind the originally proposed schedule. <br />The work is now expected to be completed by mid April, 201 l. Following is a description of the <br />status of the work by task. The scope of work has remained the same as originally proposed: <br />TASK ITEM A— FILE RESEARCH <br />This item has yet to be completed. <br />TASK ITEM B— FIELD EXAMINATION: This task consists of three sub-tasks: <br />1. General observations <br />2. Surveying <br />3. Soil Sampling <br />All three sub-tasks were complete as of November 2008. <br />TASK ITEM C— OiTTLET INSPECTION: The outlet inspections were complete as of November <br />2008. <br />TASK ITEM D— LABORATORY TESTING: The laboratory testing has been completed for all of <br />the dams as of August 2010. <br />TASK ITEM E— PRELIMINARY STABILITY ANALYSIS: The procedure for estimating shear <br />strength from the filed and laboratory data has been complete which consists of approximately a third <br />of the stability work. Stability modeling has yet to be completed. <br />TASK I'TEM F- IDENTIFY SPECIFIC NEEDS: This item has yet to be completed. <br />TASK ITEM G- PRELIMINARY COST ESTIMATES: This item has yet to be completed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.