Laserfiche WebLink
IX. RFFEIZENCES <br />1. Victor Dam No. 2 Rehabilitation Projec�, Phase I Feasibility Studv. Greenhorne & <br />O'Mara, Inc., Mazch 1987. <br />2. HEC-1 Flood �,vdrog�h Packaee. U.S. Army Corps of Engineers, Hydrologic <br />Engineering Center, 1985. <br />3. �vdrometeorological Report No. 55. Probable Maximum Precipitation Estimates. <br />Colorado River and Great Basin Drainages, U. S. Department of Army Crops of <br />Engineers, March 1984. <br />11 <br />