My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150016 feas study
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150016 feas study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 9:28:29 AM
Creation date
8/4/2011 3:06:55 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150016
Contractor Name
Idaho Springs, City of
Contract Type
Loan
Water District
7
County
Clear Creek
Bill Number
HB 98-1189
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
H. Collateral <br />The City can offer a collateral interest in the "Water Activity Enterprise" revenues (the <br />City has an Enterprise that handles both water and wastewater, and a vote is not required to use <br />these revenues as collateral). The collateral interest will be on parity with other liens against <br />water related revenues. <br />I. Institutional Considerations <br />The City of Idaho Springs has applied to the CWCB to borrow $825,000 from the CWCB <br />Construction Fund. The loan is contingent upon CWCB approval and the successful negotiation <br />between the CWCB and the City. Discussions with CWCB have also considered combining the <br />existing $130,000 CWCB loan with the requested new loan. <br />J. Opinion of Feasibility <br />The selected alternative is technically and financially feasible. There are no significant <br />roadblocks that would keep the City of Idaho Springs from successfully completing the <br />alternative. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.