Laserfiche WebLink
. . IAIOO�IW11'�I-C� � <br />s.o <br />PROPOSED WORK SCHEDULE <br />5.1 GENERAL <br />We are prepared to start work within about 1 week after Notice to Proceed. We would <br />plan to start drilling in the field about 10 to days after Notice to Proceed, contingent <br />on weather conditions and the ' i drill rig. <br />� <br />�� <br />Woodward-Clyde Consultants <br />23360/PR0.5 12-0E-93(S_S3am)lRPT 5 � 1 <br />