My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Southwest - Goodman Point Phase II_Final Deliverable
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
SOUTHWEST & YAMPA
>
Southwest - Goodman Point Phase II_Final Deliverable
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2012 2:46:19 PM
Creation date
7/14/2011 3:51:32 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Southwest
Applicant
Goodman Point Water District
Description
Goodman Point Phase II
Account Source
Basin & Statewide
Board Meeting Date
9/19/2007
Contract/PO #
150462
WSRA - Doc Type
Final Deliverable Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
At the present time there are 17 homes in the District which are currently connected to the new <br />system. There is capacity in this system for some additional taps; however, the area is unlikely <br />to see substantial gro«rth. The project ���as completed on time and under budget. Goodman Point <br />residents are extremely pleased and satisfied «�ith the project and the availabilitv of a reliable, <br />safe source of c�omestic �t-ater. <br />Attached to this report is a map which shows a general layout of the waterlines. Additional <br />information is available from the District at P. O. BoY 805, Cortez, CO 81321 or b_y contacting <br />JR Berrv, President, at 970-759-9562. <br />
The URL can be used to link to this page
Your browser does not support the video tag.