Laserfiche WebLink
, <br />BUDGEZ' <br />Total Costs <br />WSRA Funds <br />Matching <br />Funds <br />"I'��sk . � . <br />�ll Amer . . ...: . , . $26,804 <br />`�tructure, Fence, P� � �f _� �,, $43,000 <br />�; z����, <br />�'r�=�1� #1 � <br />$126,909 <br />�►tt iipi,-�`� '� $20,008 <br />Task 3 — SCAI�:� <br />Timberline Elec��-:;� $42,000 <br />"i:�c�; 4 — Pi e8�a�� <br />,';.;t; �3-, �� $1,283 $36,148 <br />In-Kind Contributions <br />Total Costs: $260,�00 <br />Cost Detail <br />Tota1 Proj ect <br />Costs <br />$26,800 <br />$43,000 <br />$126,909 <br />$20,008 <br />$42.000 <br />$37,431 <br />$296,148 <br />Item: Labor Materials Equipment Other Contract <br />Ser��ices <br />1. Tank # 13 $4,125 $10,000 $1, 783 $4,100.00 $126,909.00 <br />2. Pump <br />Station <br />3. SCADA <br />4. Pipeline <br />Tota1 <br />Page 2 of 5 <br />$18,472 � $13,965 � $6,463 <br />$9,000 � $16,325 J $11,800 <br />Soils Testing EAI West <br />(Tank) <br />E ui ment Rental <br />$4,100.00 $26,800 <br />Soils Testing All American <br />E ui ment Rental Pum <br />Timberline <br />Electric <br />$306 <br />Total <br />$146,917 <br />$69,800 <br />$42,000 <br />$37,431 <br />$296,148 <br />