My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150306 contract docs
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150306 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 3:15:57 PM
Creation date
6/22/2011 3:43:01 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150306
Contractor Name
Consolidated Extension Canal Company
Contract Type
Loan
Water District
0
County
Bent
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. PROJECT PROVISIONS <br /> 1. Construction Fund Program Procedures. During the completion of the PROJECT, the <br /> BORROWER shall adhere to the CWCB Construction Fund Program Procedures <br /> (Section 8), of the Project Summary. <br /> 2. Eligible Expenses. The PROJECT expenses for which the BORROWER is eligible for <br /> loan disbursements are listed in Eligible Expenses (Section 9) of the Project <br /> Summary. <br /> 3. Loan Disbursements. The CWCB shall disburse loan funds in accordance with the <br /> Disbursement Schedule (Section 10) of the Project Summary. <br /> 4. Time for Performance. The BORROWER recognizes that time is of the essence in the <br /> performance of all of its obligations under this contract. Therefore, the BORROWER shall <br /> complete the PROJECT within the time specified in Time for Performance (Section 11) of <br /> the Project Summary. <br /> 5. Indemnification By The Construction Firm. The BORROWER shall require all <br /> Construction Firms and their subcontractors to indemnify the STATE and the BORROWER <br /> against all liability and loss, and against all claims and actions based upon or arising <br /> out of damage or injury, including death, to persons or property, caused by any acts or <br /> omissions of those parties or sustained in connection with the performance of any <br /> contract related to the PROJECT or by conditions created thereby, or based upon any <br /> violation of any statute, ordinance, or regulation, and the defense of any such claims or <br /> actions. <br /> 6. Liability Insurance During Construction. During construction of the PROJECT, the <br /> BORROWER shall require the construction firm(s) and any subcontractors to maintain the <br /> following insurance coverage in the limits shown during the term of their contracts for <br /> the construction of the PROJECT. The BORROWER shall provide the CWCB with an <br /> Acord Form 25 evidencing said insurance prior to commencement of construction, <br /> maintained until construction is complete, and shall provide the CWCB with <br /> documentation of renewals of said insurance. No payments shall be made to the <br /> BORROWER unless all insurance certificates are current. <br /> a. Builder's risk insurance for construction in progress for all perils of loss including fire, <br /> wind, hail, and vandalism in an amount equal to the completed value of the <br /> PROJECT. <br /> b. Worker's compensation and employer's liability insurance in the required statutory <br /> amounts. <br /> c. Automobile liability insurance that includes coverage for all owned, non -owned and <br /> hired vehicles with minimum limits of $1,000,000 combined single limit for bodily <br /> injury and property damage. <br /> d. Commercial general liability insurance with minimum limits of $1,000,000 combined <br /> single limit for each occurrence and $2,000,000 general aggregate. This insurance <br /> coverage shall include products /completed operations and bodily injury/property <br /> Loan Contract C150306 <br /> Page 6 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.