Laserfiche WebLink
SECTION 9 — ELIGIBLE EXPENSES. The following items are eligible for loan disbursements. <br /> A. Preparing final designs and specifications for the PROJECT. <br /> B. Preparing bid and construction contract documents. <br /> C. Preparing environmental assessment or environmental impact statements, and otherwise <br /> complying with the Federal National Environmental Policy Act. <br /> D. Complying with all federal, state, and local regulatory requirements, including the obtaining <br /> of all required permits. <br /> E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br /> regulations. j <br /> F. Actual construction as called for in the design documents and in change orders approved <br /> by the CWCB and the BORROWER. <br /> G. Engineering services for construction management, including design and construction <br /> management for CWCB- approved change orders. <br /> H. Interest during completion of the PROJECT pursuant to Paragraph A.4 of the Contract. <br /> I. Legal services for reviewing engineering services contracts, reviewing this Contract, <br /> reviewing construction contract documents, and for complying with all federal, state, and <br /> local regulatory requirements. <br /> J. PROJECT- related expenses incurred prior to the Effective Date of this contract in <br /> accordance with the approval of this loan. <br /> 10 — DISBURSEMENT SCHEDULE <br /> For Project costs: The BORROWER shall prepare a periodic progress report which contains <br /> a statement of the PROJECT costs expended for that period and shall forward said statement <br /> to the CWCB. After receipt of the periodic progress report from the BORROWER, and review <br /> and acceptance of the items therein as eligible expenses as described below, the CWCB <br /> will pay to the BORROWER the amount set forth in the report or such portion that has been <br /> approved by the CWCB. Such payment shall be made within thirty (30) days from the <br /> CWCB's approval of each progress report. <br /> SECTION 11 — TIME FOR PERFORMANCE <br /> PROJECT Beginning: Upon Effective Date of this Contract (the date this contract is signed <br /> by the State Controller or his designee). <br /> PROJECT Finish: Four (4) years from the Effective Date of this Contract <br /> Appendix 1 to Loan Contract C150306 <br /> Page 3 of 3 <br />