My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150306 contract docs
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150306 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 3:15:57 PM
Creation date
6/22/2011 3:43:01 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150306
Contractor Name
Consolidated Extension Canal Company
Contract Type
Loan
Water District
0
County
Bent
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Summary — The Consolidated Extension Canal Company — <br /> Contract No. C150306 <br /> SECTION 1 — BORROWER INFORMATION <br /> Name: The Consolidated Extension Canal Company <br /> Address: 4653 Table Mountain Drive, Golden, CO 80403 <br /> Contact: Amy Willhite, Secretary/Treasurer <br /> Phone Number: 720 - 497 -2026 <br /> E -mail address: amy.a.willhite @xcelenergy.com <br /> Type of Entity: a Colorado nonprofit corporation <br /> Section 2 — Project Description <br /> A. Description Of PROJECT: The BORROWER applied to the CWCB for a loan to be used for <br /> the Las Animas Consolidated Canal Diversion Project, located in Bent County, hereinafter <br /> referred to as the PROJECT, at an estimated total cost of $1,275,000. <br /> B. Description of Feasibility Study: The CWCB has reviewed a feasibility study report on the <br /> PROJECT entitled "Feasibility Study for the Emergency Repair of the Las Animas <br /> Consolidated Canal Diversion Dam," dated February 2010, compiled by Amy Willhite and <br /> Steve Jamieson, P.E., of W.W. Wheeler & Associates, Inc., which is incorporated herein by <br /> reference, and, based upon the feasibility report, the CWCB determined the PROJECT to be <br /> technically and financially feasible. <br /> SECTION 3 — CWCB'S AUTHORITY <br /> Construction Fund This loan is made pursuant to the provisions of §§ 37 -60 -119 and <br /> 37 -60 -120, C.R.S., which authorize the CWCB to loan money for water projects from the <br /> CWCB Construction Fund for the benefit of the people of the state, provided that the borrower <br /> assures repayment of that money. <br /> Small Proiect Loan: This loan is made pursuant to the provisions of §§ 37 -60 -119 and <br /> 37 -60 -120, C.R.S., which authorizes the CWCB to loan money for water projects for the benefit <br /> of the people of the State, provided that the borrower assures repayment of that money. <br /> Section 37- 60- 122(1)(b) C.R.S., authorizes the CWCB to make loans of up to $10,000,000 <br /> from the CWCB's Construction Fund and the State Severance Tax Trust Fund Perpetual Base <br /> Account Fund without prior approval from the General Assembly. <br /> SECTION 4 - BOARD APPROVAL <br /> At its May 2010 meeting, the CWCB approved a Small Project Loan from the Construction <br /> Fund to the BORROWER in an amount up to $180,285 for PROJECT costs, not to exceed 90% of <br /> the cost of the PROJECT, with a loan origination fee of 1 % in accordance with CWCB Policy No. <br /> 16, at an interest rate of 2.75% per annum for a repayment term of 30 years. <br /> SECTION 5 — SCHEDULE OF EXISTING DEBT <br /> No existing debt. <br /> SECTION 6 - COLLATERAL <br /> The collateral provided for this loan, as evidenced by the executed Security Agreement, in the <br /> form attached as Appendix 4 and incorporated herein, shall be a pledge of the Borrower's <br /> Appendix 1 to Loan Contract C150306 <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.