Laserfiche WebLink
� <br />� <br />payment shall be made within thirty (30) days from the CWCB's approval of each <br />progress report. <br />SECTION 11 — TIME FOR PERFORMANCE <br />PRO�ECT Beginning: Upon Effective Date of this Contract (the date this contract is <br />signed by the State Controller or his designee). <br />PRO�ECT Finish: Four (4) years from the Effective Date of this Contract. <br />[The rest of this page is intentionally left blank.] <br />Appendix 1 to Loan Contract C150316 <br />Page 4 of 4 <br />