My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150316 proj completion ltr
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150316 proj completion ltr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2011 11:32:54 AM
Creation date
6/7/2011 10:01:21 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150316
Contractor Name
Trinchera Irrigation Company
Contract Type
Loan
Water District
35
County
Costilla
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Date: <br />Borrower: <br />Principal Amount; <br />Interest Rate: <br />Term of Repayment: <br />Loan Contract No.: <br />PROMISSORY NOTE <br />March 21, 2011 <br />Trinchera Irrigation Company <br />$251,793 <br />2.75% per annum <br />30 years <br />C150316, dated March 21, 2011 <br />Loan Payme�: $12,434.65 <br />Payment Initiation Date*: �/ -� �� � � 2- ° 1 � <br />Maturity Date*: -,�tl ,� y/.� Z- O�/ <br />* Payment Initiation Date and Maturity Date fields are filled in after the project has been <br />substantially completed. <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />� <br />FOR VALUE RECEIVED, the BORROWER promises to pay tF� Cotorado Water Conservat� Boa�'d <br />("CWCB"), the Principal Amount plus Interest for the Term of Repaymer�t, pursuant to the LOAN <br />Corrrw�cT and this promissory note. <br />Principal and ir�terest shall be payable in equal Loan PaymeMs, with the first paym�M due and <br />payable one year from Paymertt Infiation Date (the date the CWCB determines that the project <br />is substar�tially complete), and annually thereafter. All principal, iMerest, and late charges, if <br />any, then remaining unpaid shall be due and payable on or before the Maturity Date. <br />Paymerrts shall be made to the Colorado Water Consen►ation Board at 1313 Shemnan Street, <br />Room 721, Denver, Colorado 80203. <br />The CWCB may impose a late charge in the amount of 5% of the annual payment if the CWCB <br />does not receive the annual paymerrt within 15 calenda� days of the due date. <br />This Note may be prepaid in whole or in part at any time without premium or penalty. My <br />partial prepayment shall not postpo�e the due date of any subsequerrt paYments or change the <br />amount of such paymerrts. <br />All paymer�ts reoeived shall be applied flrst to late charges, if any, next to accrued interest and <br />then to reduce the prinapal amount. <br />This Note is issued pursuant to the LoAN Cotv'rt�cT between the CWCB and the BoRROwER. <br />The Lont� Co►�c7 creates security interests in favor of the CWCB to secure the prompt <br />payment of all amounts that may become due hereunder. Said security interests are evidenced <br />by a Security Agreerr�errt(s), Deed(s) of Trust, a�d/or Assignmerit(s) ("Security Instrumer�ts") of <br />even date and amour�t and cover certain revenues, real property, water ri9hts and/or accounts <br />Of the BORROWER The Lo� Cor�rrwhcT and Security Instruments grant additional rights to the <br />CWCB, including the right to accelerate the maturity of this Note in certain events. <br />If any annual payment is not paid when due or any defauR under the LoEw Cor�►CT ar the <br />Security Instruments securing this Note occurs, the CWCB may declare the entire outstanding <br />Appendix 2 to Loan Contract C150316 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.