My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DWSA Update(2007) SOW
CWCB
>
Grants
>
DayForward
>
DWSA Update(2007) SOW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2011 1:47:47 PM
Creation date
5/31/2011 1:46:49 PM
Metadata
Fields
Template:
Grants
Applicant
Southeastern Colorado Water Conservancy District
Grant Type
Non-Reimbursable
Fiscal Year (i.e. 2008)
2007
Project Name
Drought Response and Preparedness in Colorado
CWCB Section
Water Conservation & Drought Planning
Contract/PO #
OE PDA 07-44
Grants - Doc Type
Scope of Work
Document Relationships
2007 Colorado Drought & Water Supply Assessment Update
(Attachment)
Path:
\Drought Mitigation\DayForward
2007 Colroado Drought & Water Supply Summary Data
(Attachment)
Path:
\Drought Mitigation\DayForward
DWSA Update(2007) Invoices
(Attachment)
Path:
\Grants\DayForward
DWSA Update(2007) PO
(Attachment)
Path:
\Grants\DayForward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 4: Prepare Final Report <br /> The key project deliverable will be the final report. The final report will summarize all findings <br /> from previous tasks and will present the best available information about drought and water <br /> supply planning in Colorado. The report will describe the entire study, methodology, results, <br /> areas of importance identified by water providers, recommendations for the SECWCD and the <br /> State efforts to assist in drought preparedness (structural and non - structural), and any other <br /> pertinent information and issues that arise as a result of the research. <br /> A draft final report will be provided to the project manager for review. Comments, edits, and <br /> recommended changes will be incorporated into the final report and the final draft will be <br /> delivered in hard copy and electronic format (PDF and MS Word). <br /> The final report will also include an appendix with full enumerated responses to the survey. <br /> Electronic versions of the report and all datasets developed during the project will also be <br /> provided on CD. <br /> Project Schedule <br /> Because of fiscal constraints the draft report for this project must be completed by the end of <br /> July 2007. The review period can extend beyond that date as required by the client. All billing <br /> will be completed by the end of July 2007. <br /> 1February 1 March April - 1 May July <br /> ID Task Name Duration Start Finish 1/28 1 2/11 1 2/25 1 3/11 1 3/25 1 4/8 1 4/22 1 5/8 1 5/20 1 6/3 1 8/17 7/1 1 7/15 <br /> 1 Assemble and Review Recent Colorado 81 days Mon 2/5/0/ Mon 4/30/0i <br /> Water Supply and Drought Studies and <br /> the 1 177 Process <br /> 2 Survey Colorado Municipal Water 41 days Wed 4/25/0i Wed 8 /20/07 <br /> Providers <br /> • <br /> 3 Data Analysis 20 days Thu 6/21/0/, Wed 7/18/0/ <br /> 4 Prepare Final Report 43 days Fri6 /1/07 Tue 7/31/07 <br /> Project Budget <br /> The total budget for this project is $74,968. A budget summary by task is shown below. <br /> Table 1: Estimated project budget <br /> Aquacraft Subcontracted <br /> Task Description Labor Labor Total <br /> Assemble and Review Recent Colorado Water Supply <br /> 1 and Drought Studies and the 1177 Process $11,800 $11,800 <br /> 2 Survey Colorado Municipal Water Providers $750 $28,248 $28,998 <br /> 3 Data Analysis $8,000 $5,350 $13,350 <br /> 4 Prepare Final Report $9,500 $6,320 $15,820 <br /> 5 Project management - SECWCD $5,000 $5,000 <br /> TOTAL FOR PROJECT $30,050 $39,918 $74,968 <br /> *Subcontracted labor includes all subcontractor costs (NRC and Aspen Research) which are <br /> detailed in Table 3. The subcontracted labor includes costs to develop, implement, tabulate, and <br /> analyze the municipal water provider survey. The largest portion of these costs are the telephone <br /> survey costs for employing the Aspen Research call center. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.