Laserfiche WebLink
Phase III. Complete Installation of Flow Monitoring and Control Equipment, and Necessary <br />Telemetry Equipment at the Tremont measuring Flume <br />Task Schedule Description Unit Total <br />Cost Task Cost <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />Jan `09 Purchase Data/Control Logger (1 site). Part Number: Campbell $ 1,364 <br />Scientific - CR850 ke board dis la , extended tem erature . <br />Jan `09 purchase Solar Panel and 1Vlounts (1 site). Part Number: BSP-4012, $ 260 <br />40 watt, Northern Arizona Wind & Sun. <br />Jan `09 Purchase D-C Motor Batteries (2 required). Part Number: John $125 <br />Deere 12 Volt "Extreme-Tem " Batte . <br />Jan `09 Purchase Radio Pack (1 site). Part Number: 286755, Allied $ 626 <br />Electronics <br />Jan `09 Purchase Conduit/Wire to Communicate Between Flume and $ 1.50 <br />Overshot Gate. 220 feet. Part Number: Numerous. <br />Feb `09 Purchase Control Relays (2 @ 24 volt) and Miscellaneous Wire $ 150 <br />Connectors. Part Number: Numerous. <br />Mar `09 Install Communication Conduit Between Flume and Overshot Gate. $ 0 <br />B Pioneer <br />Mar `09 �ogram and Install Equipment for Task 1— 5 above. Paradigm $ 300 <br />Data, LLC, Aurora, Colorado <br />Phase III Total: <br />$ 1,364 <br />$ 260 <br />$ 250 <br />$ 626 <br />$ 330 <br />$ 150 <br />$0 <br />$ 300 <br />$3,280 <br />Phase IV. Develop Internet Interface that is Accessible to Shareholders and Water Resource <br />Officials. <br />Task Schedule Description Unit Total Task <br />Cost Cost <br />Develop Simple Internet Interface. Users Can View Their <br />Respective "Remaining" Pumping Allocation on a Daily Basis. <br />1. May `09 Will be Viewing Tables Already Necessary to Comply with the $ 1,200 $ 1,200 <br />State's Protocol for Augmentarion Accounring. Paradigm Data, <br />LLC, Aurora, Colorado <br />Phase IV Total: $1.200 <br />Total Project Cost: �4 <br />Pioneer Water & Imgation Company Page 4 <br />Flow Monitoring Project <br />